Search results | Page 3

Search results

  1. G

    Spot the mistake ++++

    No I'd tags on switch lines
  2. G

    Help with ring main please

    I bet the neutral from the rcbo is in the neutral bar along with the neutral in the circuit so as soon as a load is plugged in there is no return path through the rcbo
  3. G

    Help with ring main please

    Omg is he for real one thinks this guy has no clue what he is doing
  4. G

    Oven and cooker circuits

    Why would you do that then
  5. G

    Shower isolation swiching

    Ir should be done with All accessories in place and screwed back surely you can do phase neutral to earth to avoid the neon
  6. G

    Static Caravan 100ma OK ?

    Don't all tt earthing systems require rcd protection
  7. G

    Oven and cooker circuits

    5800+7400=13200 13200÷230=57.4A 57.4A-10=47.4A 47.4A×0.3=14.22A 14.22A+10=24.22A with diversity applied
  8. G

    Quick question regarding wiring a light.

    No the diagram above feed to the ceiling rose using the loop in loop out method
  9. G

    Quick question regarding wiring a light.

    Neutral from ccu to n on ceiling rose Line conductor from ccu to com on first switch 2 strappers from l1 and l2 of first switch to second switch Com on second switch to s/l on ceiling rose Also cpc every where
  10. G

    Quick question regarding wiring a light.

    I am doing my level 2 practical assessment next month and your lighting circuit will be in pvc conduit in singles The circuit will be switch feed
  11. G

    Level 2 nearly over... Looking for advice on work experience

    Your college can write you a letter that you can give to jib they will accept it as I am on the level 2 course aswell and a few of the other students have done it like that
  12. G

    What do you do after Level 3 2365?

    I'm currently doing level 2 on weekends doing it in 9 months I feel that is a nice steady pace and plenty of room to learn level 3 is also over the same period
  13. G

    High R2 - Lighting Circuit

    I would send him a quote to get it to the state he wants it and add a bit for the 3 hours you have not charged for
  14. G

    High R2 - Lighting Circuit

    I would send him a quote to get it to the state he wants it and add a bit for the 3 hours you have not charged for
  15. G

    Have you had a look at priceyourjob.co.uk

    Im' Not a sparks but the company I work for charges £55 A light

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top