  1. B

    Icertifi EIC cert changes

    Hi, just a quick question, to anybody using the ICertifi software, has anybody else noticed that the EIC certificates have now changed? They now give a section on results page for “overcurrent protective device” and a seperate section for RCD this not allowing Rcbos to be recorded??? Also all...
  2. IMG_6433.jpeg

    IMG_6433.jpeg

  3. B

    PV and not and RCD protection.

    Thanks for reply appreciated 👍This is actually a PIV unit (poss pressure ventilation) I think that’s where the confusion has arisen. Surely SPD should be installed anyway on complete rewire?
  4. B

    PV and not and RCD protection.

    Just had word off client it turns out it is actually Envirovent who installed the PIV. So a fairly big organisation me thinks. To be fair I could just got the RCD as requested but don’t like charging customers for works not required.
  5. B

    PV and not and RCD protection.

    100% agree on both points.
  6. B

    PV and not and RCD protection.

    Unbelievable isn’t it!! Looks like I’ll h e an awkward phone call tomorrow attempting to educate whoever on the correct terminology and usage of RCDs, can’t wait 🤣🤣.
  7. B

    PV and not and RCD protection.

    Correct James.
  8. B

    PV and not and RCD protection.

    Hi Dave thanks for the reply, my original post was slightly vague and in all honesty a little misleading, but this is the message I received for the “PV” installer via the client. In actual fact what has been installed is a PIV unit (Envirovent to be precise) I can only presume that the...
  9. B

    PV and not and RCD protection.

    Had a customer ask for RCD to be changed to Type A as he has had a company install a PV unit which they have left with the spur switched off as new regulations state that PV units must have a type A RCD 🤔. Has anybody else had this situation??
  10. B

    EV charge point ENA form v3.4

    Hi all, just a quick question, does anybody out there know if there is an editable version of the ENA form below. EVCP & HP Connections Form v3.4 Or is it a case of fill in by hand and scan? Thanks.
  11. B

    Building control confusion!!!

    Hi Tim, thanks for your input and apologise for not getting back to this thread earlier, COVID!!! As you say it’s not a bad thing at all, the main issue I had with BC was that they themselves seems confused about the paperwork (well that’s how it came across anyway) it appears that the...
  12. B

    Building control confusion!!!

    No cert issued on 25th, building control notification sent on 16th.
  13. B

    Building control confusion!!!

    Had a lovely conversation/argument with building control this morning, the scenario is this, Completed job (4 flat rewire) EIC’s sent to client as normal, building control notification done via NICEIC portal, all good (you’d hope) Then received email from client (the architect) to inform me that...
  14. B

    Loft conversion Smoke detection

    Yer smokes will be going in all rooms, but ideally with no wiring at all due to the issues I mentioned.
  15. B

    Loft conversion Smoke detection

    Agreed that’s my plan, just seeing if anybody else had done similar. ?
  16. B

    Loft conversion Smoke detection

    Good solution always an option if all else fails. ?
  17. B

    Loft conversion Smoke detection

    I agree that they are the way forward, I’ll have a chat with building g inspector and see if grade F would be compliant.
  18. B

    Loft conversion Smoke detection

    Hi all, as most people will be aware the building regulations on fire protection for loft conversions are pretty strict. The situation I have on a couple of loft conversions is this. buliding inspector now requires fire doors on all doors leading onto escape route or smoke detection in ALL...
  19. B

    Pscc and Pefc

    makes sense now thanks for the replies.
  20. B

    Pscc and Pefc

    Yes I understand the difference in size of the conductors but if the earth and neutral are combined I.e. connected in the cut out then surely the only difference is the size of the earthing tails conductor which at a length of say max 3m’s should be negligible. So line to earth (CNE) Or line to...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top