Search results

Search results

  1. D

    Installation in a wooden building.

    Evening.. Just pricing up for a full rewire of a 3 storey fulley wooden building, just wondering if there are any special considerations to adhere to? I have seen the fire putty and intrumescent sleeves for the back of sockets, but wondering if these are required or just recommended. Cheers
  2. D

    RCBO tripping advice.

    Hi thanks for the advice, it's a Hager CU.
  3. D

    RCBO tripping advice.

    Evening All...I've not posted in a while which is a good thing as I can now work most things out myself!! Just a bit of help needed with this one though!! I have two consumer units, both have a mixture of MCB's and RCBO's on one of the consumer units the RCBO's are tripping randomly (The...
  4. D

    Calculate 3 Phase MCB size

    40 amps to supply 4 way board. Way 1 12 kw Fryer..3 phase 16 amp mcb (Thinking diversity will bring it below 16amps) Way 2 6 kw Grill...3 phase 10 amp mcb way 3 L1 16 amp socket circuit L2 10amp for 2.2kw water heater L3 Blank Way 4 L1 Blank L2 6 amp Lights...
  5. D

    Calculate 3 Phase MCB size

    So further to this, I need to calculate the cable size for a 40amp 3 phase MCB. Do I just base it on the CSA per phase i.e 6mm?
  6. D

    Calculate 3 Phase MCB size

    Hi..I should probably know this but don't do too much 3 Phase stuff!! Can anyone give the formula for working out the size of a 3 phase MCB? I have a 12kw 3 Phase fryer to install. Cheers
  7. D

    3 consumer units off one 3 phase meter.

    Cheers, thought as much!
  8. D

    3 consumer units off one 3 phase meter.

    Evening..Just wondering if it's acceptable to run 3 separate consumer units off one 3 phase meter, I have seen 3 consumer units off 3 meters on a 3 phase supply many times but never off 1 meter? Cheers
  9. D

    RCD nuisance tripping headscratcher.

    Have done all the RCD testing..passed ok. I'll get myself a earth leakage clamp meter if that's the only way of finding this fault.
  10. D

    RCD nuisance tripping headscratcher.

    I have been out to a nuisance tripping RCD this morning, there are 3 socket circuits, 1 boiler circuit, and 1 oven circuit protected by the RCD. I started by checking the IR between L-E and N-E, the reading was between 2 and 3 M ohms on every circuit and leg. I then disconnected the CPCs for...
  11. D

    Moving a consumer unit.

    As all EICs are!
  12. D

    Moving a consumer unit.

    Question.. If a consumer unit needs moving by 1 metre and all the cables need to be jointed through, is a full EIC needed as if its's a consumer unit replacement? Cheers
  13. D

    EICR code?

    Part 1.2 on the EICR 'condition of service head'
  14. D

    EICR code?

    Part 1.2 on the EICR 'condition of service head'
  15. D

    EICR code?

    I didn't say it requires improvement, I was asking the opinion of the forum, but now you have asked, it just came to my attention because of the age of it.
  16. D

    EICR code?

    C3..service head requires improvement or not??
  17. D

    Help with EICR codes!!

    Well I just misread it!!
  18. D

    Help with EICR codes!!

    Well blow me down...every day's a school day!! I'm a bit young for 15 edition, started on 16th.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top