I have known a large meter box contain a cut out, meter, contactor, live and neutral connector blocks, main consumer unit, off peak consumer unit, and a shower switch. I was there to fit a 4 pole isolator for the 24 hour and off peak supply and it took ne a couple of hours to rearrange and...