Looking at this job, I haven’t touched anything yet so any faults you find are nothing to do with me.

The top switched fuse feeds a CU in the house.

The bottom one is old and the customer would like to use it for another CU in an out building. A 16mm SWA has been run to the box.

Now I am struggling how to think about terminating it all and doing a neat job.

First thing would be to seal the hole and stop the snails.

I’m not sure about using the old switch fuse as the holes cut out on the top don’t look right and is a cover missing? I have seen new ones of these available from wholesalers so that could be an option. But could be a tight squeeze.

There is room for a second meter box along side which could house the 2 switches or just the the second one and then would just need to worry about getting meter tails through.

Would like to hear your thoughts so I can come up with a plan.

Thanks.

[ElectriciansForums.net] What would you do here.
 
Yes and then have the metallic fused switches. Not sure about running tails from box to box. Not sure what’s the largest diamater of conduit/copex available to fit 2 x 25mm tails plus 16mm earth.
 
I'd get rid of both the switches and install DP isolator switches. Power the out building the usual way. I don't see the purpose of multiple cut out fuses.
 
Why is the bottom switch not used? Could it be defective (possibly damp / moisture ingress?) and they’ve just left it place and fitted new one above?
I know you’d rather keep the fused switches ,but Could you not install a small DB with a main switch and two 63amp mcbs, so you’ve got isolation and overcurrent protection for both out going cables and you don’t have faff on with Henley blocks or try to link those old fused switches together?
 
I prefer switch fuses for discrimination.
Was just thinking out aloud with that idea, was thinking of the tidiest way to do it, but of course Zs readings etc would have to be taken into account for suitability of protective device.
 
Nothing would be said,as a vast number of the people fitting them,would not be aware of a problem,if there were a nest of snakes at the bottom,and the top was on fire...

Well to be fair these meter guys are under pressure to fit certain number of meters per day. They don't waste time poking around the consumers side or looking for defects with the exception of gas leaks.
 
Well to be fair these meter guys are under pressure to fit certain number of meters per day. They don't waste time poking around the consumers side or looking for defects with the exception of gas leaks.

They have to fill in what I think is called a MOPs report which is a meter operators sheet where they note any defects or queries to the existing equipment. They waste a lot of DNO time reporting exposed conductive parts in the cutout, what the rest of us would call the pme terminal. Each report has to be investigated.
 
This used to be economy 7 where the CUs are remote from the meter box and so require KMFs due to distance.
The bottom one was for the off peak which has become obsolete probably due to gas central heating replacing electric storage heating.
That is a British Gas smart meter and electric is not their strong point.
 

Reply to What would you do here. in the UK Electrical Forum area at ElectriciansForums.net

Similar Threads

Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
937
  • Question
If it's buried ducting, have you thought about digging up a section of the buried cable close by, cutting it and pulling in a few extra meters...
Replies
6
Views
639
can you post a picture of the heating element? if possible with the power off and the cover off.
Replies
5
Views
420
  • Question
Most manufacturers recommend them to be fitted. We are required to take that into account. If they had been fitted clearly it would have been...
2
Replies
27
Views
2K
  • Question
The last couple of de-loops that I have been involved with had the single phase supply replaced with a three phase cutout (as I believe the DNOs...
Replies
5
Views
747

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock    No Thanks