2391 | Page 5

2391

You will need 50 posts under your account before joining in with this thread because you can't link out without 50 posts first.

  1. J

    final 2391

    Just found out I've passed my 2391 exam,well made up.
  2. S

    2391

    Any one no if you can the 2391 if not do you have to do both the 2394/2395 bit confused
  3. T

    2391 Still running?

    So until today I thought the 2394 & 2395 were the replacement of 2391 and i was looking in to booking this in a couple of months once i've completed my C&G 2330 level 3 But, after looking on the NAPIT website today it still looks like they are running the 2391 (Link Below) Inspection Testing &...
  4. S

    replacement of 2391

    hey just wanted some help which is the course to do now they have stopped 2391 7many thanks
  5. J

    2391- When was it first introduced?

    Hello It's my first Post but I've have been reading and comming to the forum for knowledge for a while now. I've found that someone has asked almost every question I thought of but either they have not, or I cannot find the thread... Question is "When did City and Guilds first introduce...
  6. W

    March 2391

    Good luck to everyone sitting exam tonight
  7. W

    last min 2391

    alright, im sitting the dreaded tonight and just going through some last minute bits and wanted to make sure im getting things right so ive a couple of questions. first 1: Ze = 0.4 the installation is carried out in multicore steel wire armoured cables, having 70degrees thermoplastic...
  8. L

    IR test 2391 The way to answer ?

    Hi guys, Just wanted to get your advice on answering a 2391 question. If i was to get a question "Describe how to carry out an IR test on a radial socket circuit of a new installation" for example , would i be able to mention the safe isolation procedure like this 1)Seek Permission /Inform...
  9. J

    2391

    Well the final 2391 written exam is coming up this Thursday and I've been revising like mad every night ,read the guidance note 3 five times and still learning and been going through question papers so wish me luck people this time I will pass.
  10. S

    c&g 2391

    i have the practical part of this ok but need to resit the written part is this still avalable and worth doing
  11. R

    2391 exam usefull info

    hi might be usefull on the www.cityandguilds.com website if you search 2391, then scroll down righthand side to additional documents and expand, you will find city and guild 'chief examiners reports' about past papers and where students went wrong. usually usefull info is 3-4 pages in. the...
  12. W

    some more 2391 questions

    hi guys, i have a few more 2391 questions id like a bit of guidance with 1. state three different examples of a limitation that may be agreed with a client which is not already stated on the periodic inspection report. a. access restrictions, evenings or weekends b, interuption of supply to...
  13. L

    2391

    Hi everyone , I passed my 2391 written exam in June 2011 but went on to fail on the periodic in the practical! I know it sounds daft passing the theory and failing the practical!! But is there a time limit on re-sitting this before the theory expires?? Any thoughts or advice would be great! Cheers
  14. W

    2391 question

    hi can somebody help me out here, i cant see the answer for the life of me, its probably straight forward for most of you but for some reason i just cant get my head right state three ways, other than listed in GS38, in which safety may be ensured when using test instruments having previousley...
  15. Y

    2391 Practical re sit, Need a little bit of help...

    Hi all, On friday I have the re sit for my 2391 practical, I'm confident on all the dead tests, Zs, RCD's and functional checks etc. And I'm fairly confident with the PEFC and PSCC, However on our test rig we have 2 boards (A main board, and a 'Garage' board) So do I need to do the PEFC and PSCC...
  16. E

    certs 2391

    Ok, if I have the 2391 do I have to join a body (NIC, ECA) to supply a certificate to domestic owner after I carry out works? Or can I fill in certificates from the regs and just hand them over? Do building control have to be notified by law??
  17. E

    certificates 2391

    Ok, if I have the 2391 do I have to join a body (NIC, ECA) to supply a certificate to domestic owner after I carry out works? Or can I fill in certificates from the regs and just hand them over? Do building control have to be notified by law??
  18. W

    a few 2391 questions

    alright guys, just after abit of help for 2391, the first question is: identify three conditions that must apply if a minor works certificate installation works certificate is to be issued. i cant decide if i just cant see the answer in my head or if i just dont have a clue, i seem to be...
  19. L

    2391 inspection and testing

    Has anyone undertaken this exam and if so is it hard to get to grips with, I have average testing experience but not quite clued in yet with all the equations etc.
  20. M

    new 2391

    Doing the Initial Verification Inspection and Test on Monday and dont really have any experience of testing. Anybody done this already or got any useful advice?

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top