Hi,
Just wondering what people interpretations of the regs are regarding metal CU's in a commercial setting. I've seen some people code them C3 on an EICR and others say that the Metal CU's are just for domestic settings. I've read the regs and I think they could be read either way. Anyone any...
Hi everyone, I know that part P apply to dwellings and its associated building, and under that there are some electrical work that are notifiable.
But what about commercial premises eg restaurants, schools, pubs..
What electrical regulations applies to it, is there any alternative similar to...
I'm looking at fitting a commercial garage out.
I plan to put a 4 pole 300MA S TYPE rcd as main switch on a 12 way 3 phase board providing I can get the Ra down low enough, should be fine though, otherwise it'll be a 100ma s type. Socket circuits and maybe lighting circuits will go on 30ma DP...
Hey guys,
So I have a community centre I do some work for, they are looking to replace all the sockets and switches, which is a load of them. They are currently metal sockets and switches, because its an old building most of the sockets are in the large skirting board, because of this I...
Hello,
I work in a facility with a lot of 3-phase parking lot lights. These lights are controlled by a number of photocells that close lighting contactors near the service panel. My problem is that these photocells are very difficult to access due to their location, so covering the photo cells...
So I've been doing domestic for years, and thought about upgrading with napit to commercial installs.
Apparently commercial work is not notifiable, only need to register for eicrs (which don't even need registering with a scheme anyway)
So, if I changed a CU or installed a circuit, 3 phase...
Hi everyone,
A quick background to me and my question. I have been working for a commercial catering equipment engineering company for about 10 years and working mostly repairing appliances but also fitting new equipment in commercial premises, Sometimes running new circuits from the CU for new...
Dear Friendly Electricians, I am an IT specialist. I am currently in a sticky situation. The company I'm working with is a digital advertising company. We have LCD screens to display ads. They asked me to install a timer on the screens. So they turn off during the night when the mall is closed...
Have been doing some small jobs on a commercial unit converted for storage, changing lights and broken sockets and the like.
Units look to be c.20 years old.
The interesting thing is the unit is Three Phase TT, the rod being directly beneath the DB and incomer all in a small cupboard.
There...
I will be upfront and honest I never really got involved or know too much about this so a few queries...
-Do I need any paperwork, additional recognition to install several new charging points at an HMO
-Are there still any grants available to the landlord to counter the costs
-If I need to...
I currently have a shop which has 3 phase 6mm cable running to it but the shop is only allowed single phase, currently renovating and they need more than a 32a supply. Can I parallel 2 of the 6mm and upgrade the quicklag breaker to a 50a at the MSB and make it a 50a main switch at the shops sub...
Need to find a v small, hard wired, wall mounted UPS to provide 60mins for fire alarm, emergency lights and fire suppressant (mist) in a BMO to satisfy the requirements of section 560. Phone calls and catalogues so far have only found me massive plant room size, I need to fit this in a...
Hello,
Would welcome any advice-
We have an earth fault to a fire alarm loop, everything connected is XP95 and there are isolators in many bases and call points..
Is there a hints/tips way to find this, without having to gain access everywhere.
Would splitting the loop, powering the half that...
I was wondering, are BS88 fuse boards still used on some new installations especially industrial and even commercial. And if so would that be ok with the regulations or not because its not retrospective. I know they are quite outdated and its hard to find a electrical wholesaler selling BS88...
Hi All, hope your all well.
I was hoping if I can please get some advice in regards to SWA. In Particular using SWA as CPC. Cable size 95mm2
I have a table for SWA which shows various information, in the last two columns it shows the "resistance of steel armour under fault conditions at 70...
Hello all. I have a problem that I'm sure someone can help with. The electric motor I have (pics attached) has no ratings plate. There are no supply wires shown, just the internal connection box wiring. The picture of the wiring diagram looks to be single phase but the box wiring has me...
Just a quick question
Do rcbos need to be used on lighting circuits in a commercial setting?
Eg on a new build school/hospital/what ever
Or on a new circuit install on a school/hospital/ what ever commercial building?
Hi Im working in a staffed residential home (for severe learning difficulties/disabilities residents) they have a new onsite tanked gas supply being installed to supply two domestic sized gas boilers in seperate locations, which will replace the existing big oil fired boiler. I need to clarify...
It is a 6.5kW thermostatically controlled water heater if you ignore the rest of the gubbins.
So that would be a Purpose #6 for diversity ie: None allowed. = 28A.
But you could treat if like a cooker too. Purpose #3 ie: 10A + 30% FL current over the 10A. = 15.4A
What do you think?
Thanks
Hi there i have been doing a job for the past month re-wire of a pub with my journeyman this pub also serves food to the public now the kitchen guys came in who had there own spark to connect in some of the 3 phase stuff we installed a zone on the fire alarm panel for a gas shut of solenoid but...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc