Hi we are filling in the above form for the first time to send to the DNO.
We are a Ltd company made up of 2 directors, 1 director is Napit accredited do we fill in his details as the installer or do we fill in the company details as the installer, we are awaiting MCS accreditation at the...
Part of the G83 Apprendix 3 commissioning form asks for the Generator Test Report (Appendix 4). This I assume is the test(s) done by the manufacturer to make sure their product complies, in which case we don't have to supply this to the DNO? Is that correct?
Hi All
I’ve just completed my first install but need to commission it. This install is to be used for MCS assessment so I need to clarify a couple of points. I did a BPEC course and the handbook is now causing me confusion. Here goes.
2 strings of 7, 190w panels. SMA SB2500 with 3 inputs in...
Hi,
Am I right in thinking that if I change the country to the the UK on set-up it will go to the correct defaults for this country, or do I need to change anything else.
Any ideas?
R
Trying to get my head around pv system commissioning sheets ready for future mcs assessment. How do i work out my array parameters Voc (stc) and Isc (stc). How do i find out the dc rating (V) of the protective device and also can anyone explain how string test method annex -2 Voc, Isc,Sun is...
Can any Elecsa registered help with this ?
I'm doing my first set of notifications on-line. Very simple of course but two of the questions are;
1. Was commissioning required yes/no 2. Was Commissioning carried out yes/no.
What do they mean of this? I understand commissioning within...
hi , first post
is there a minimum light level, watts per meter that MCS require for commissioning the pv system, i have been told that a reading of over 200 watts per meter is necessary for acceptance for commissioning paperwork...
Hi,
I need a bit of guidance on filling out PV commissioning forms.
There doesn't seem to be any help on filling out the forms on line and my PV course didn't give us any in depth advice on filling out these forms.
My first query is on the Indiviual installation commissioning form (SSEG)...
I am a fully qualified electrican with C&G 2360 1&2 17th edition and 2391, and was recently looking into doing an HNC in electrical engineering and posssibly training as a commissioning engineer. I was wondering if anyone could help with how too get into commissioning, i.e. companies that do...
Can anyone help me out here? I've just looked at the Calibration Cert for my multimeter. Although I purchased the meter last September (08), the calibration date is November 07. I first used the meter on a (non-part P) job in February this year, so I'm guessing that's what counts as the...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc