Hi all, your thoughts please ...
going to price a job in the morning ... just been briefed that it is to "finish off" the electrics in a stable / annexe conversion... being cynical this seems to me that either the builder has taken on most of the actual wiring (1st and 2nd Fix) himself OR the...
Hi guys
i carried out an ECR last week and it had a few category 1, 2 and 3. Obviously resulting in a fail which wasn't great news for the client. They said well there's no point in giving us an unsatisfactory cert and asked if I could do the works and issue a satisfactory grade. So iv since...
I'm sure this has been asked before, and I have done some searching here, but not quite sure how to phrase it to search properly.
I have just completed some minor works on a property installed to the 16th, i.e. no rcd's on lighting. The client required replacement of existing ensuite lighting...
Ok guys looking for some advice. Will be contacting my scheme provider and LABC tomorrow.
basically builder starts wiring an extension and then calls me in to finish it and sign off. I told them i cant do that and it will need putting right as i cant even see their first fix due to plastering...
Hi all,
I'm currently near completion of my 1st year 2365-02.
I don't think I'm looking to a change my current occupation ( Paving & Landscape Contractor ) to 'full-time' sparky.
So rather than doing another 2 years at college ( 2 evenings a week ) to complete the full 2365-03, I'm seeking...
Hello to all, my name is Rob.
I'm currently working full time (4 long days, not as a trade person) and the future isn't looking bright for the company so looking to train in a complete different career path.
I'm looking at the college route doing the new 2365 level 2 and 3 then jumping over...
Hi guys,
I am completly stuck, I am replacing my Kitchen Light Switches with new Chrome switches, I thought it would be just a quick straight forward swap, how wrong could i be!!
There are 2 separate lights in the kitchen on a 2 gang switch, indepently controlled by the same switch (2...
Hello Chaps and Chapesses
I appreciate this sort of question has been asked many a time and believe me I have just about read them all..
I hope you all are not sick and tired of the same questions but here goes.
At 35, I'm considering a whole new career change. Presently, I'm in a white...
Does anybody know if there is a product you can buy new that can replace the original mechanisms in switches like the early crabtree and Britmac ones? I have several where the cast housing is perfect but the switch itself needs replacing!
Been to a property and been asked to add a socket in Bradford City Centre
Just to give you an idear of the system hear goes..
Connecting meter to DB is 10mm twin and earth with a main service fuse of 40 Amp
DB this is the first time I have seen a db like this, MCB type things but the are...
So I"m looking to replace all my rear lights with arrays of LEDs.
Now my question is this: when I turn on my parking light, some of my lights light up dim, but when I hit the turn signals or brake lights, they light up bright, how do I achieve this effect with LEDs?
Well, from what I gather...
Hi Chaps
There will be lots of opinions I guess but what do you guys regard as a good (or the best) domestic CU for a full RCBO install (8 circuits)?
Looking ease to work with as well as space at the top of the RCBOs.
Thanks All
Sky
Hi everyone,
I start my apprenticeship in September straight from school. I'll need to buy a pair of safety boots, are there any recommended electricians' boots? I'm looking forward to contributing aswell as asking questions. Thanks for your time.
Regards...
I have a comprehensive test kit that would be ideal for electrical test specialist, solar or electrical installer. All you will need for 2391 test and inspection and 17th edition.
The set comprises of a Kewtech KT62 rcd. loop impedance tester, Kewtech KT 203 clamp meter, Ethos proving unit, A...
Hi Guys,
I have for sale an as new FLUKE 1654B, reporting software and calibration certificate (purchased 11/11).
It's all in perfect working order and it's had minimal use due to me having a a second meter which I prefer
so this one has to go.
£560 plus P&P.
I will put it on ebay next week...
Hi,
I'm just completing works which included replacing the CU.
Therefore I'm providing an EIC for the complete installation.
Does the client still need an EICR? (they may be letting out the flat)
The EIC obviously contains all the test results you would find in an EICR, probably more allowing...
Is it just me or is it taking 4 times as long to complete the new EICR. I inspected an office and workshop with 2 CUs and therefore using the multiple boards cert...its a joke. Doing it through Amtech probably isnt helping, but i'm thinking of putting the cost up! I can just about understand...
Gave the lounge members first sight, now opening up to the remainder of the forum.
Looking like having a G59 turned down (customer may need dedicated supply) and could have a complete 4kW system spare
HiS250MG Hyundai silver frame panels
Schuco rails and clips
SMA 4000TL inverter
DC & AC...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc