complete | Page 6

complete

  1. G

    Potential Complete System

    Looking like having a G59 turned down (customer may need dedicated supply) and may have a complete 4kW system spare HiS250MG Hyundai silver frame panels Schuco rails and clips SMA 4000TL inverter DC & AC Ancils PM if interested
  2. S

    Complete revelation.

    I,m in Cornwall and with all the granite knocking earth rods in can prove difficult, to say the least. Had a job recently that required new rods. Managed 1 + 1/2 5/8ths rods in one location, using a sledgehammer, before the rod started to bend, and my arms started to hurt lol. Installed a...
  3. whinmoor

    Complete Nightmare Day

    Operating outside our usual territory in Norfolk to get FiT for a relative. Booked a local roofer with solar experience to assist with installation. Phone call at 7.30am to say roofer had just crashed his van into a sugar beet lorry: "If anyone had been riding in my passenger seat, they would...
  4. W

    complete kit availible

    customer now changed his mind so have a complete kit availible 14 antaris p6 230w panels fronius ig 30 rails and clips pantile roof anchors if this is of any use to anyone please get in touch
  5. H

    Will i still achieve the correct qualifications to get a JIB card?

    Hi I started my apprenticeship in sept 2007 and left due to problems at work, I left in January 2009. I achieved my level 1 hand skills and did my 2330 201 exam. I am now back at college on a part time course 1 day a week with the other modern apprentice's finishing my level 2 (will take my...
  6. M

    What are the minimum quals/experience to work in the Afghan?

    Hi all, Can anyone please tell me what are the minimum quals and experience that a sparkie would need to work in Afghanistan? Also what sort of things would bar you from working there, ie criminal convictions, that sort of thing. Also how long is the vetting process, what sort of references you...
  7. K

    Basic Complete Newbie Question

    Hi everyone,I have today literally started learning about electrics and have never fitted anything before. We recently built a new piece of furniture next to a double plug socket so had to remove it so the furniture would fit next to the wall. I made a hole in the unit and now need to extend the...
  8. J

    Found a supplier with complete one stop solar PV kits available in the UK

    Individual Kits available (Next Day Delivery, from Tuesday the 15th November onwards) Choose your panel UPsolar 190 - UPsolar 210 - UPsolar 230 Inverter: SteccaGrid or Power One Mounting Kit HILTI or QMS Mounting Kits Fixings, gen meter, isolators etc FULL KIT READY TO INSTALL Plus VAT &...
  9. P

    COMPLETE KITS(where are they)

    Anybody selling complete kit for delivery 21st?
  10. T

    Complete management mcs qms

    HI EVERYONE, NEW TO THIS SOLAR PV WORK AND LOOKING TO GET MY QMS IN PLACE FOR MY MCS INSPECTION. BEFORE I SPEND MY HARD EARNED CASH ON SOMETHING U/S IS ANYBODY USING SOFTWARE BY COMPLETE PICTURE. Quality Management Manual - Quality Management System - Complete Picture SAP U-Value MCS Software...
  11. i=p/u

    complete kitchen rewire

    have been asked to do kitchen rewire isit ok too split tails and run too new consumer unit with 30mA powerbreaker before board. very likely going to have 63A main switch, 32A ring 2.5mm and seperate circuits for all appliances... on 16A breakes all on 2.5mm. do you reccomend not putting any...
  12. R

    PIR carried out then CU changed. Do i complete EIC aswell?

    Hello i was hoping someone could advise me on which way to go with this: I carried out a PIR on a car garage and afterwards explained to the customer the observations/recommenations before i wrote the report up in which i recommended a CU upgrade as the old one had rewireable fuses, nothing...
  13. M

    4x Sony CCTV Cameras - DVR Complete Security Kit £175 Delivered.

    Aright guys, I have a CCTV system to shift here, the ruddy client changed their mind (the swine). Here is where it is from, including full spec/price: 4x Sony 420TVL 6mm CCTV Camera DVR Complete Security Kit - Smart-iPhone-Remote Access - OFFER-02 1x 4 Channel High Spec DVR (remote access...
  14. dez0178

    First Year of City and Guilds complete, Bring on the second year!

    :rockon2:Well I have just completed the First Year of Level 2 C & G 2330, Got a Distinction on both exams and must say I am looking forward to Year 2. I have Heard It is more difficult due to the maths, is this the case? Can anybody please tell me what to expect in year two and when is the best...
  15. S

    Can I complete a Periodic Inspection?

    Hey guys, I have been asked by a work mate it I can complete a Periodic Inspection Report for his brother who is in the middle of buying a house which the insurance company have required a survey of the electric's assessed. I am booked to take my 2391 in July but they need the report sooner...
  16. T

    anyone complete a Domestic installer course at access trainbing in december 2009?

    i completed a course in december 2009 and im just wondering if there is anyone on here that was on the same course,if so wondering how your getting on in the trade?
  17. T

    Apprenticeship Wanted

    Hello Im Thomas i am in need of an electrical apprenticeship. I am fully qualified to City and Guilds 2330 Level 2 electrical installation and am currently studying City and Guilds 2330 Level 3 electrical installation and i am required to get an apprenticeship so i can complete level 3. I...
  18. W

    NE ENGLAND, 27 yr old Improver/Apprentice/mate looking for work to complete my time!

    I'm new to this site so please go easy on me!! I am a hardworking team player looking for work that will allow me to continue with my Electrical Apprenticeship, working towards my NVQ Level 3, C&G 2391 Inspection and Testing and AM2 assessment. I have completed all Level 3 exams and I am...
  19. G

    Dissertation on Photovoltaic Systems. PLEASE HELP!

    Hi All, I am a final year student studying BSC Building Surveying at Kingston university. For my dissertation topic, I have chosen to investigate about photovoltaic systems to establish today’s demands and the reasons why some homeowners have chosen to install them and why others have not. I...
  20. O

    Complete Picture software

    Hi Has any one used "complete picture" software for their qms? i am struggling to understand how to compile a qms and am reluctant to shell out on another course. i seems to offer a straight forward way to create a quality management system, but i would be keen to know what others think. cheers

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top