Hi,
Please excuse my ignorance but I am looking at the completion cert for BS7909 and wanted to know what section 10 refers to " Proctective devices in the ISU if present" What is the ISU
Thanks
Hi there,
I'm Just looking for some advice on completing my training, I have achieved my city and guilds level 2 & 3 and am now looking to complete the nvq 3, I have been told I need to build a portfolio of different jobs and some NVQ paper work to complete this qualification,
I am however...
Hi,
I need to test and certify an existing 110 volt distribution board. however, I am having trouble completing the standard BS7671 schedule of test results.
Firstly
What is the tripping time? 5 seconds ( TABLE 41.6 Refers) or 0.3 Seconds or 0.8 seconds ( TABLE41.1 refers)
The distribution...
Hi all, is it a requirement to supply a certificate of completion, along with all other forms i.e applinace reg etc, to the customer after carrying out testing??.
I dont think I have seen this mentioned in the cop. If it is a requirement would any of you fine fellows point me in the right...
hello,
i recently did the solar pv course and remember filling out some completion forms at the end of the worked example, not the test sheets, it was a seperate form where do i get these from?
Also, once the pv system is up and running do the local electricity supplier come out and read the...
Anyone come across smaller completion certificates? When you only need to fill out details for the one circuit you have worked all the rest of cert is wasted. Also what certs do you find the easiest to fill out,Niceic seem very detailed compared to the Robin ones .
thanks
i have been asked to do some work which is a electrcical instalation for a broadband mast which will consist of a feed into the a hut and then into a consumer unit which will then feed a light, sockets and f/s.
the owner has also asked for a completion certificate something which am not...
I wonder if any one can help me,I'm just finshing my level 3 2330 & already have 2392,I am going to join napit and as far its I can see the software that comes with the mergers does not support napit certifications,can anyone please give me some & advice on the best way forward.
Kind regards...
Hi
I did 3years of an electrical apprentaship, but sadly this got cut short before i became qualified. It was with a contractor and through the JIB. i completed all my college work and have the relevent city and guilds certificates. I also completed 2 log books.I had about 8 months to 1 year...
A customer has terminated a job before completion. No disputes have been raised over the nature or quality of the work. The installation is not complete and has not been tested or certified. Do we ahve any further obligations in this respect?
Thanks
Im just about to qualify and could do with some advice. I intend on working with my current employer to gain more vauable experience. However iv been approached to do some private jobs, House and garage rewire etc in my own time. I wanna do this above board. Do i have to be part p with...
some help when filling in installation certificate
on the design bit off the form what are you putting in for the bit that is accordance to bs 7671 ______ amended to____ date except departures
i looking for what you guys put in hope the same as me trying to win a bet with some one on this
The senario is. You have installed a new ring circuit in a domestic dwelling on an existing board with several other circuits. Do you have to complete an EIC for the new circuit only or do you detil the other circuts and test those also and then complete the EIC.
Cheers Guys