Is there any reason under 17th why a lighting circuit (notionally a radial) shouldn't have a "distribution" tapped off it part way along, rather than looping in at each switch or luminaire? - By this I mean a junction box, which then serves power to sets of luminaires and switches off to the...
Hello all,
I've just carried out the remedial works from a EICR on a small industrial unit ( I didn't carry out the EICR). The 3 phase board had tails entering through seperate holes on the bottom, which was coded as a 2 due to possible eddy currents. I remedied this by cutting out the gap...
hi can anyone tell me the regulations on burying hv cable, depth, ducting?, need to be covered, any markings, type of infill or anything else of that nature- thanks i cant find it in the regs book
Hi- not a PV spark just a normal one (!) but have a PV question if I may.
A friend has had it installed, & is happy. I am quite familiar with the fixed wiring at the house & recall her mentioning that the PV equipment has been "connected to the fusebox upstairs in the airing cupboard". This is...
Hi,
Hope someone can help.
I need to test the prospective fault current at a garage distribution board (i.e. a sub board) but the no trip function of my tester will not work and trips the RCD which serves the garage circuit in the main board.
As I understand it, the figure to take for...
My engineer wants me to fit a gas bond from a local distribution board in an office but as we know it should be direct from the MET. What if the distribution board is moved or removed? Needless to say i wont be putting my name to it. This isnt right is it?? How can i make the best of a bad...
ive just completed an install in huntingdon near cambs i just want to verify what the DNO of this area is? its my first install and want it done right!!
All
I suspect this was in the wrong section (this one seems to be theory / practice related for trade).
Sorry about that - will put in the general section instead.
Paul Briggs
I'm running a 30 metre length of three core 16mm armour to feed a garage conversion which could have a high loading.
The cable will be run from the external meter box where I will split the meter tails via a Henley
The problem is There is naff all room in the box and I can't fit a switched...
Hi guys
Its been a while since i have been here and i have a new problem.
I am to supply and install a 500kva distribution over 2 stages, 250kva now and the rest in the next 5 years. I am going to use Eaton mem switchgear, a 800a buzbar with 630mm2 tails and a 400a mccb within a 12 way...
Hi guys, went to price a job today in a Hostel. When looking at the mains position i was shown to the room containing it and to my horror it is in the showeroom. As you can see from the picture , the Board itself has been boxed in with plywood and has a hasp on it it is 700mm away from the...
We are down to replace various DB's on old type commercial buildings, having looked at the install, they are in a bad state of repair, does the replacement DB, require RCBO's for all lighting circuits due to the cabling concealed in walls etc. Or can you fit like for like as it's pre 17th or is...
Hi folks, adding new lighting circuit to distribution board in small rented commercial property. There's a dist board in this property however main board and point of origin are in an adjacent rented out small commercial building that is difficult to access. Landlord has keys etc but as it's...
If any of you are interested in distribution and protection you may find this interesting. http://www.electrical-installation.org/enwiki/Scope_and_content_of_Wiki_EIG
has anyone got any good guidance or information on how they design/allowance for voltage drops for distribution circuits and also how they calculate the V/D for distributed load circuits such as ring/radial socket circuits and lighting circuits
I cant really find anything in the usual books...
Hi guys just a quick one, we all know the height requirements of part p being between 450mm-1200mm for standard equipment, but ive never heard of a standard height for a db. And all sparks i know just say its a common sense thing, so in existing buildings (part p free) i just tend to measure...
Does the dedicated circuit for a PV system count as a Distribution or a Final circuit?
Looking at the spec for the inverter most disconnect times are specified as 5 secs which implies a distribution circuit.
Clear Sky Solar Ltd
Am confused by the two 'types' of EICR - i.e. for either single or multiple distribution boards
Section N is confusing me the most - the 'single' version asks about supply details but the 'multiple' one doesn't :thinking:
Am I right in thinking that you use the 'single' form(s) for the first...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc