  1. sparkdog

    ELECSA wait time?

    Hi,Does anyone know what the average wait time is for ELECSA after you have paid them?I don't fancy having to wait for weeks after shelling out £400+.Thanks,sparkdog.
  2. T

    Wiring Ring Final Circuit.. Laminate floor ??

    Have a customer who wants me to wire a new upstais ring main in his house.. The only problem is that one of the bedrooms has laminate flooring, he doesnt want to lift the floor up and cant touch the ceiling from below. The customer has asked if i can run the wiring behind the skirting board...
  3. R

    RCD problem

    Hi When I do a loop test on an installation protected with an rcd using my robin kmp 4118 (no d lock) the rcd doesnt trip. Both the tester and rcd have been tested ok by other means - any ideas? Thanks A very frustrated engineer
  4. P

    henley blocks in trunking

    I have to connect up a check meter. Is it ok to terminate the 2 armourds into 4" metal trunking. Then use henley blocks to terminate the feed/loads, and come out of them with double insulated tails into the check meter?
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Daily, weekly or monthly email

Back
Top