eic | Page 10

eic

  1. M

    EIC maximum demand

    could any one tell me what rules they follow when filling in the max demand box on the EIC , do you work it out then add diversity ( time consuming ) or switch on as much as possible and use clamp meter ? a spark told me recently he enters the rating of the service fuse , another once told use...
  2. W

    Filling in eic

    Hi ,im in the process of completing an eic but have a couple of queries regarding two boxes.the first is "reference method" i assume this is the method of installation ie "c","101","a",etc.but i have also seen other methods ie,"method 1(m1),"method 3(m3).which should be used?. Also there is a...
  3. G

    nic eic

    Hi has anybody got approved contractor with the nic? if so what was the assessment like as im a bit nervous . i have limited testing experience.?????
  4. S

    Periodic inspection report on NIC EIC software

    Hi Is anybody using the NIC EIC certification software to complete periodic reports on commercial buildings with a large number of db's? im not getting on with it as you can have an observations page for each db just wondered how others get on with it?
  5. sythai

    EIC test certificates.....

    Morning all... Just want to check if I'd be ok using this template for an EIC certificate, it's free :) (see attached pdf) I'm a registered niceic domestic installer, but it does slightly differ from their certificates ? Have done a couple of jobs already using it, and the amount of time it...
  6. J

    Minor works or full EIC?

    Hello, I have to install additional sockets to an existing ring circuit and change some singles to doubles, one in a kitchen. I believe the added sockets should not be notifiable but the one in the kitchen mean that it is notifiable? As the fuses are old rewireable ones, and no rcd exists on...
  7. S

    Tail Sizes on EIC

    Hi, I have recently replaced a consumer unit on a TT earthing arrangement. I went down the local Building control route, no problem so far. Sent in the completed certificate, but got it declined with this stated on the paperwork. "TAIL SIZES NOT GIVEN THEREFORE UNABLE TO DETERMINE IF EARTH...
  8. M

    NIC EIC a waste of money?

    have seen a nic registered company , one time they had wired a disabled bungalow with 29 points on a ringmain which fed 2 downflow heaters , the entire kitchen , and an electric fire . when i carried out a periodic there was no ring cont on p,n,or cpc when i traced it out one leg went from c/u...
  9. G

    Eic advice

    I was called out to a house which the board had melted, due the fact a 7.9kw , 10.5kw and a ring in the garage was all ran from a 32amp ohh and the showers ran in 2.5 T&E. So i changed the board and will put it down as a distress change, sorted the bonding out etc. My problem is i have found...
  10. R

    EIC Clarification RCD

    Evening All, When filing out a EIC test schedule I test all circuits that have RCD protection individually ?.I have a split load board and as such each RCD controls a number of circuits.Do I have to test each circuit and record each value 1x and 5x and do 180 degrees.So if i have 5 circuits...
  11. O

    EIC certificate after a CU change

    Guys Can you advise how to complete the following sections on a EIC certificate after a Consumer Unit change. The reason I ask is this is the part of the market I am aiming for so to begin what is the correct way to complete the following parts and could you give me some guidance on what...
  12. B

    NIC EIC Views regarding calibration

    With our annual assesment coming up I just wondered if anyone else has heard of this :confused: Couple of NICEIC sparkies have said that the assesment inspector has told them that provided they have a calibration check box in regular use. And historicaly the readings obtained are always the...
  13. C

    A few questions on writing out an EIC........

    I've had a few conflicting opinions on filling parts of the EIC for certain installation types (mainly non-domestic submains), I'm sure many of you can set me straight though :) I have a couple of queries, Maximum demand - This is for the whole board, where you've just added a circuit to a...
  14. R

    EIC for Electric shower

    Hi there, Not posted for a while so bear with me. Need to do a electric shower and will complete a EIC and I guess schedule of tests page will only have that circuit on it.Or as I have split tails and put a henry block in do I need to test the whole house.A seperate RCCB unit will be installed...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back