enough | Page 3

enough

  1. Dan

    Aurora - Ever Been Lucky Enough To See It?

    This is on my list. Still haven't seen it yet it's been on my list for years. Anybody been lucky enough to see one of them, if so where and how? I've seen a couple of cruises where they say if you don't see it after a couple of weeks you get your money back.
  2. L

    Private Work

    Hello All. Here's my situation, im currently NICEIC QS where I work, im earning a half decent wage but its never enough right. Im debating with the idea of setting up on my own but the thought of trying to replace my salary is frightening, mortgage and family so very risky. Not got enough...
  3. i=p/u

    18v drill

    My drill started smoking (not an e-cig) any of you wise men know if carbon brushes can cause this or is the windings coating breaking down. the brushes are wore but not completely. Small springs push them in and thinking maybe not enough push onto the armature/rotor
  4. A

    Medusa t2801 generator help!

    Hi all, My generator is only putting out about 50v when I start it up. After revving it for a bit it puts out 100v, but obviously still not enough for my 110v drills. It's quite old but don't really want to get rid of it. Anyone able to help with what's wrong with it? TIA Austin
  5. GMES

    Right enough of this .....

    Right we've had xmas and new year can we now get back to being Electricians/ Engineers I don't want to hear anymore merry well wishes. Let normal service resume, and on the bright side it will soon be christmas!!
  6. S

    Not qualified enough to put up christmas lights

    I've just been round the corner to an old ladies house to put up her Christmas lights round her windows etc. Bog standard plug in sequencing led Christmas lights. It's a cup of tea job, no money to change hands I'm just doing her a favour. As I'm not part p qualified and don't belong to niceic...
  7. B

    Wind Farms

    Is it me or is this growth in wind farms just ridiculous? Doesn't this country have enough wind of its own without wasting electricity making more of it by running these big fans? Its a blatant Tory waste of the tax payers money ......
  8. K

    Indesit cooker (oven) not heating up quickly enough

    Hello there, Firstly apologies if I should have posted this in the DIY electrical section so if it needs moved fair doos. Indesit cooker KP9507EB problem is its taking about 40 mins to reach 200C....grill works fine and so does the thermostat light on control panel..oven is...
  9. PEG

    An old fashioned "Thankyou" to Megger...

    No,biggee,but we all whinge when a corporate reams us,so,when i receive a good bit of service,respect is due. Rang up Megger UK,last week,asking for a replacement case for a DCM330,explain that i have a few items of their kit,and cannot find case for sale singularly. Nice gent in product...
  10. H

    Contractors not having enough time or patients with apprentice (me)

    Hi folks Im work for my local council and as we don't do a wide variety of work such as conduits, etc they send me down the contractors they use sometimes for some experience to help build up my portfolio for my nvq, its a smallish newish company around employ around 20 people and been around...
  11. S

    Is 2394/2395 changing

    Hi everyone, can anyone confirm if the time scale on doing the written exams is going from hour and a half to two hours soon or is not true.
  12. B

    How do you supply V.2 Form to a customer?

    So I am kind of lazy person, and in reality I tend to overthink every choice I make. Do you guys write V.2 form with pen or print this on Laptop? Because if you fill this with hand writing, I think it is best to get simplest portable PAT Tester with batteries, which will only do insulation and...
  13. Brightspark2

    Ive had enough...

    Ive had enough of all this health and safety gone mad here in england. Im moving abroad where I can get away with things like this: Hilarious pictures from around the world of workmen cheating death | Mail Online I mean what can go wrong?!:rolleyes4:
  14. stidge

    Isolator overheating

    Hi ! Situation is this , 10mm t&e approx run 10 M , 10-10.5kw Shower, 60898 40 amp , I recently( February) replaced isolator due to overheating( neutral load side) . Installed a mid price range (45a)new one , made sure off good tight connections , but now have same problem overheating load...
  15. W

    2394-2395 or 2391 past paper sought by a nervous candidate

    I have just enrolled on a 2394 course for my second attempt as the last try under 2391 knocked my confidence and I didn't ever have enough spare cash to try until now. Also not able to afford a third try with my mates salary barely covering child support. I feel like a lamb getting ready for...
  16. B

    is the Industrial unit supply man enough?

    Hi Guys A friend of my mates is setting up a micro brewery in a small industrial unit. The unit is fed by a 3 phase 100amp supply the brewery plant is on order and the boiling part of the plant is fitted with 3 x 18kw (3 phase) immersions, then another piece of equipment has 1 x 18kw 3 phase...
  17. P

    RCD tripping. Give me a clue!

    Hi Guys A Happy 2014 to you all. I've recently had two calls to trace the cause of intermittent tripping in domestic installations, and failed miserably! The latest - 4 way box feeding garage, utility room, garden shed. Customer reckons it sometimes trips when they switch the light on, but can...
  18. H

    Advice on plan (diagram included) to remotely turn on an amplifier using CAT5

    Hi all, I am currently have an amplifier that is powered by an ac/dc adapter (as shown in diagram below). In my house I have CAT5 cable run from where the amplifier is to a position on the wall (it is currently not being used). I want to be able to push a button on the wall where the CAT5 cable...
  19. M

    SolarImmersion + de-strat = do i need it?

    4kwpa system and a new solarimmersion...working surprisingly nicely even though it's December. family of 5 who bath and shower a lot. therefore might benefit from a full tank as it is always used and we work from home and shower in day after sport etc etc would I benefit from a de-strat pump...
  20. D

    Apprentice not getting enough experience...

    I'm on my 4th year doing electrical installation and have got my AM2 coming up soon. The problem is I work for a contractor who ONLY do house bashing work, and proper house bashing rewires in a day 1st and 2nd fix etc I'm just slightly worried I will be overwhelmed when it comes to the AM2? was...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top