exactly | Page 2

exactly

  1. G

    NICEIC assessment in exactly one week

    got my NICEIC domestic installer assessment on the 20/06/2012, bit worried tbh lol Test gear calibrated - check Public liability - check big green book - check on site guide - check part p document - check eawr 1989 - on a memory stick good enough? its about 200 pages long Have i missed anything
  2. S

    Pneumatic Timer Switches

    Anyone know of a pneumatic timer switch with a 1 hour delay suitable for use with a wall mounted domestic/office heater? Everything I can find has a max of ten minutes or is designed for lighting circuits.
  3. T

    Am2 on Monday!!!

    As above I have the big one on Monday, without tempting fate, i like to think I'm ready for it. But if anyone has any pointers, tips or reminders then that would be great. Cheers guys.
  4. A

    What is a JIB card needed for exactly?

    Hey all, I am new to the electrical work and have just completed my college - 2330 lvl 2 2330 lvl 3 2382 (BS:7671) 2377 (Pat Testing) Soon to complete 2392 (Monday 11th July) and 2391 (Sept 2011) I have heard JIB card talked about round college but not really got a proper understanding of...
  5. C

    Exactly how big is your ruddy garden then!?!?!

    I get emails from a company called Lawson HIS about specials on tools etc, they're pretty good as it goes, I've had quite a few bits off them to date. Check out the latest though...... Love it.
  6. I

    Tapping Off A 3 Phase Supply

    Lads Can you tap off a 3 phase supply to meter block to suppy a 230 board. Chris
  7. J

    Regulation what exactly???

    Im stopping at my friends house, dogsitting and whilst having a snoop, l have noticed that there is a 30mA RCCB protecting the cooker circuit wired in 6mm sq twin&earth to a Wylex 3036 Board. It was installed by a kitchen-fitting company, who as part of the kitchen package, fitted a metallic...
  8. S

    What does part P cover exactly?????

    I posted a thread recently regarding a customer that had a shoddy electrical & building installation that had been passed by building control. My customer phoned the LABC today to explain what had happened & how unhappy he was that BC had signed off a job that was sub standard, the BC officer...
  9. R

    Commando RCBO off old wylex

    Saw something today - I'm putting a few new s/o in on a ring main in a flat. The ring main is on a 30A push-in breaker on an old wylex board, which comes out of the breaker, up a bit of twin and earth into a 'shower unit' type 1 way board with a 30mA 40A RCBO. Now, although not best practice...
  10. R

    Confused problem!!!

    Hi I went to a property today to check some lights that had stopped working. When i got there the customer pointed me at the kitchen. There was 4 spots in the kitchen and they were not switching on. I dropped the lights and checked if there was power them (had to start somewhere). I found that...
  11. madeinengland

    what exactly will 2330 give me?

    i'm in my 3rd and final year of C&G 2330. when i visited the college 3 years ago the course was sold to me as being THE course to do and at the end of the 3 years i'd be walking away with 16th edition (at the time), inspecting and testing qualifications and everything.when i ask my current...
  12. E

    RCBO trip Times

    Do I test an RCBO exactly the same way as an RCD i.e 50% 100% & 500%

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top