Supposing I have my Main Incomer (4c70mm2) at one side of a very large warehouse.
My incoming water is on the far side.
My Main Earthing bond (35mm2) is from the incomer to the M.E.T.
I am going to equipotential bond my Structural steel close to the M.E.T. (25mm2)
Can I then come off...