Ive PM'd Marvo but if any other Mod or Admin can deal with the multiple film spams by a few new members 'obviously multiple accounts - same user' as they are filling the new post list up with crap!!!!!
We are due to have our first NICEIC assessment and I have been asked to be the QS. Have I just accepted a poisened chalice? Looking at some of the completed EICRs I notice several differences in the way they are completed. We are using NICEIC style forms and the discrepancies are on Isolation...
Hi Everyone, I need some advice please. I am going to upgrade a distribution board in a domestic property. I've read the Best Practice Guide of ESC. I assume after completion I have to fill EIC and schedule of test results but I'm confused about the schedule for inspection - for new...
Hi
I am farely new to form filling so forgive me. I have split the incoming supply in the house so now it feeds to the original CU and a supply now goes to a main switch BS 60947 and rccb enclosed in a unit. This now supplys out to a garage enclosure, which feeds lights and sockets.
Is it best...
Hi Guys,
Taking 2395 exam shortly.
Im just wondering on schedule of test results form what do I put down for size of cpc for MICC cable and for SWA cables if the armour is used solely for the cpc?
I'm sure that somehow there must be procedure.
Many Thanks
Hello,
Hoping someone out there is familiar with this type of installation and how one fills in the forms. I will describe what I have in front of me. The home is fixed it has bricks around the bottom but a chassis with wheels.
The chassis is bonded to the MET
Gas & Water is connected and...
Hi
I am trying to fill in the Condition Report Inspection Schedule for Domestic Premiss with up to 100 A Supply. I have a question regarding filling in the Section (5.10) That states Concealed cables installed in prescribed zones. My installation reference method is B and there is no way of...
Hi
I am trying to fill in Section (K) of Electrical Installation Condition Report. My question is when we have faults like: High Insulation resistance on a certain circuit that i know, High resistance of main bonding that i identified, Zs too high for ring, ring discontinuous and incorrect...
Hi
I am trying g to fill in the Electrical Installation Condition Report, section J. my question is regarding checking the boxes in the section Main protective Conductors. If I have a high value for main protective conductors say to incoming water. What happens to the box Connection /...
Hi
I have two questions regarding filling in the periodic inspection report (Schedule of inspection part) for domestic installation up to 100A supply. I am using a practice board with erection methods B.
1- In section 6 of schedule regarding Shower, there is no bathroom but there is a...
Hi
Does anyone know where you can get the forms for fuel filling sites?
I've been asked to test the pumps for there fuel license.
Not sure if I would need any extra qualifications for this also?
Anyone got any experience of testing fuel punps?
Thanks
Hi lads quick question
Have recently passed lv 3 and Nvq and 17 th edition so now ready for my ecs card application. I'm reading on here you need a apprentice sign off sheet, what if I was never registered as a apprentice by my firm and no one from my old company is about to sign this sign...
Can anyone advise best software for completing electrical installation works certs etc got into the NICECI domestic installer this mornning and wanting to look a professional as possible! i have a mac so possibly looking for one which is mac compatible, and also is it possible for two separate...
I am still training to become qualified. I have the following question regrading filling the Schedule of Inspection for Periodic inspection report.
When do we use N/A and when do we use N/V? I am slightly unsure when may be some examples will help.
Many Thanks
Hi
I am trying to fill in a Schedule of test results for a domestic installation. I have one question:
When filling in the the sheet under the section Overcurrent protective device what goes in the "Type" part? Is it acceptable to just say TYPE B or do i have to get the whole number like B...
Hello all...
This may sound like a bit of a daft question but I am about to fill out my first EIC along with the schedule of inspections and test results and I just wanted to know if I put the same form number for all 3 forms as they are all part of the same install (which I think makes sense)...
hi everyone
been reading this forum for a year now and this is my first question i just hope i am doing this right.
on TT earthing we have one box for RA and one for ZE, what box do we use.
Hi everyone,
I'm having a complete blonde evening tonight, surely things have got to get better at some point!!
When filling in an installation certificate it asks for "inspector" and also "reviewed by supervisor" to sign. My question is which box do i sign one or both if I'm a one man company...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc