Hi Everyone, I need some advice please. I am going to upgrade a distribution board in a domestic property. I've read the Best Practice Guide of ESC. I assume after completion I have to fill EIC and schedule of test results but I'm confused about the schedule for inspection - for new...
Hi
I am farely new to form filling so forgive me. I have split the incoming supply in the house so now it feeds to the original CU and a supply now goes to a main switch BS 60947 and rccb enclosed in a unit. This now supplys out to a garage enclosure, which feeds lights and sockets.
Is it best...
Hello,
Hoping someone out there is familiar with this type of installation and how one fills in the forms. I will describe what I have in front of me. The home is fixed it has bricks around the bottom but a chassis with wheels.
The chassis is bonded to the MET
Gas & Water is connected and...
Hi
I am trying to fill in the Condition Report Inspection Schedule for Domestic Premiss with up to 100 A Supply. I have a question regarding filling in the Section (5.10) That states Concealed cables installed in prescribed zones. My installation reference method is B and there is no way of...
Hi
I am trying to fill in Section (K) of Electrical Installation Condition Report. My question is when we have faults like: High Insulation resistance on a certain circuit that i know, High resistance of main bonding that i identified, Zs too high for ring, ring discontinuous and incorrect...
nazoom
Thread
condition
electric
electrical
electrical installation
filling
installation
question
regarding
section
Hi
I am trying g to fill in the Electrical Installation Condition Report, section J. my question is regarding checking the boxes in the section Main protective Conductors. If I have a high value for main protective conductors say to incoming water. What happens to the box Connection /...
nazoom
Thread
bonding
box
conductor
filling
main
main bonding
question
regarding
verification
Hi
I have two questions regarding filling in the periodic inspection report (Schedule of inspection part) for domestic installation up to 100A supply. I am using a practice board with erection methods B.
1- In section 6 of schedule regarding Shower, there is no bathroom but there is a...
Hi
Does anyone know where you can get the forms for fuel filling sites?
I've been asked to test the pumps for there fuel license.
Not sure if I would need any extra qualifications for this also?
Anyone got any experience of testing fuel punps?
Thanks
Hi lads quick question
Have recently passed lv 3 and Nvq and 17 th edition so now ready for my ecs card application. I'm reading on here you need a apprentice sign off sheet, what if I was never registered as a apprentice by my firm and no one from my old company is about to sign this sign...
Can anyone advise best software for completing electrical installation works certs etc got into the NICECI domestic installer this mornning and wanting to look a professional as possible! i have a mac so possibly looking for one which is mac compatible, and also is it possible for two separate...
John Caddick
Thread
best
computer
electricians' talk
filling
sheets
test
I am still training to become qualified. I have the following question regrading filling the Schedule of Inspection for Periodic inspection report.
When do we use N/A and when do we use N/V? I am slightly unsure when may be some examples will help.
Many Thanks
nazoom
Thread
cheers
electricians' talk
filling
inspection
limitations
pir
question
regarding
Hi
I am trying to fill in a Schedule of test results for a domestic installation. I have one question:
When filling in the the sheet under the section Overcurrent protective device what goes in the "Type" part? Is it acceptable to just say TYPE B or do i have to get the whole number like B...
nazoom
Thread
electricians' talk
filling
help
please
question
regarding
results
schedule
test
Hello all...
This may sound like a bit of a daft question but I am about to fill out my first EIC along with the schedule of inspections and test results and I just wanted to know if I put the same form number for all 3 forms as they are all part of the same install (which I think makes sense)...
hi everyone
been reading this forum for a year now and this is my first question i just hope i am doing this right.
on TT earthing we have one box for RA and one for ZE, what box do we use.
Hi everyone,
I'm having a complete blonde evening tonight, surely things have got to get better at some point!!
When filling in an installation certificate it asks for "inspector" and also "reviewed by supervisor" to sign. My question is which box do i sign one or both if I'm a one man company...
Hi I am trying to fill in PIR (Periodic Inspection and Reporting Cert.)for a single phase TN-S system.
I have one question in the section (Recommendation) it asks for the the installation is further inspected and tested by ........ What date do we put? If it was Unsatisfactory what do we...
nazoom
Thread
domestic
electricians' talk
filling
installation
new
pir
question
regarding
years
When filling the Condition Report Inspection Schedule For Domestic And Similar Premiss With Up to 100A Supply, section 5 (Final Circuits), the part that states: "Concealed cables in cooperating armour or sheath, or run within earthed wiring system, or otherwise protected against mechanical...
nazoom
Thread
cables
conduit
electricians' talk
filling
new
pir
question
regarding
wiring
There is a section in the PIR Section F, that states" I/We recommend that the installation (Domestic) is further inspected and tested by ...............(Date)" What date to we put for Domestic? Is it 6 months? from the initial PIR. I don't have the date of last inspection.
Also does any one...
nazoom
Thread
different
domestic
electricians' talk
filling
forms
pir
questions
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc