Hi I am trying to fill in PIR (Periodic Inspection and Reporting Cert.)for a single phase TN-S system.
I have one question in the section (Recommendation) it asks for the the installation is further inspected and tested by ........ What date do we put? If it was Unsatisfactory what do we...
When filling the Condition Report Inspection Schedule For Domestic And Similar Premiss With Up to 100A Supply, section 5 (Final Circuits), the part that states: "Concealed cables in cooperating armour or sheath, or run within earthed wiring system, or otherwise protected against mechanical...
There is a section in the PIR Section F, that states" I/We recommend that the installation (Domestic) is further inspected and tested by ...............(Date)" What date to we put for Domestic? Is it 6 months? from the initial PIR. I don't have the date of last inspection.
Also does any one...
I am trying to fill in the Condition Report Inspection Schedule for Domestic 100A. I have my exam coming up and having some problems filing the Section 6 of this form.
In Section 6 " Locations Containing A Bath or A Shower". My test Board (Domestic) has only a shower unit and no Shower Cubical...
I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply.
My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...
Hi
My exam on fault finding is near. I now have to fill in the new report (Condition Report Inspection Schedule For Domestic And Premisses With Up to 100 A Supply). The report consist of 7 sections. Section 1 is Distributors Supply intake equipment, Section 2 is presence of adequate...
If I was the inspector When filling the Electrical installation Certificate under Declaration For Inspection and testing, I only need to sign this part? Also what do i put in the space for amended to ..?....(date) except for the departures, if any detailed as follows. What date goes in that...
Hi all, Tommorow I have an inspection and testing practicle, Fairly confident in the actual testing part however just a couple of questions for filling in our test sheets
1) Am I correct in thinking you dont need to record a type for an RCD?
2) What should be recorded in the I^N (Braking...
On the main over current protective device I'm looking at it states 100 amp 1.3/16 DIA does anyone no what type and Bsen num it is as I can't see it in the regs.
Thanks Chris
Hi there
I am going to replace a outside light. The circuit is fed from a sfcu spurred from ring socket circuit. Do I need to check the end to ends and figure 8 checks on the ring, or is r1+r2 and insulation tests and other standard tests for spur and light point satisfactory.
Also for another...
Hi guys, before starting this thread I have searched old threads on this site and had no luck finding a good one. I started a thread a few weeks a go my house rewire and now im after a bit of advice on filling chases.
I rarely do domestic electrical work so have barely touched on chasing, the...
Hi all im filling out my test paper work getting everything ready for my first inspection and i just have a question regarding one of the sections on the electrical installation cert.
In the section Main switch or circuit breaker does this apply to my main switch in the consumer unit ie 100a 2...
Hi guys, as some of you might know I`m new to the NIC DI scheme and new to filling out these purple certs.
Q1. On the EIC purple certs, under the "SUPPLY CHARACTERISTICS" section, it asks for the external earth fault loop impedance by enquiry. Does anyone actually enquire or what reading should...
Hi can anyone tell me who is the [ name of authorised signatory ]
on a Scottish power fit application form.
Is it me or do I get the installer to sign this.
I am trying to fill out most of the form today,
before my install tomorrow.
Hello, Ive installed an additional rail in a (huge) consumer, tailing off the main 30ma rcd switch (source side) into a 60947-3 isolator, feeding a 60898 16 onto my inverter cct.
do i treat the additional rail as its own installation (like an additional consumer) or do i have to get involved in...
hi, i have been filling out some practice certificates at work today and have some questions before i go for training. i was looking at a BS1361 main fuse,
how can you tell if it is type 1 or 2...it wasnt written on it.
what is the normal time recommended to put on a certificate of when a new...
Hi, I am just filling an EIC and I have no difficulty filling in the details for the “Final Circuits” but how do I fill in the details of “Distribution Circuit”?
The circuit in question is for the garage; the SWA cable from main DB terminates on to a mini DB in the garage and the garage has 2...
Filling out the above for a Sub board (D.B 12)
TN-S
TP&N
There is no board fed from abnother board, there all split in henleys straight from the meter.
D.B 12 is single phase.
Im getting Zs of circuit 1 as 0.22
R1+R2 as 0.06
Previous PIR's show Ze as 0.22 but how can this be if a...
Hi everyone
I have been asked to look at the sign lights not working on the forecourt of a petrol filling station (flourescant lamps for price on pole). Apparently not working since recent PIR carried out by specialist company.
Do you need any special qualifications as this is a filling...