Hi,
for those looking to sit the 2391 before it finally bites the dust - the final, final, final written exam date of December 2012, appears to have been changed to March 2013. Search the C&G web site under 2391 for info.
Regards.
Apologies if this question sounds a bit basic but am a little confused at the mo and quite new to the game. Here goes -
I am trying to complete a NICEIC Highway Installation Certificate for a system where there is a 230 v TT supply coming into a roadside pillar into the main BS88 fused head...
Im currently studying electrical and im up to dead tests.
ive reached continuity of ring final circuit on my scenario cd , in therory i understand the procedure and what to do but im a little un sure on finding the mid point on the sockets .
please can sombody go threw it step by step in...
I'll probably receive cries of abuse that this query was dealt with years ago but not when I was in the forum so........When testing ring can anybody think of a reason why the ring final tests (R1,R2 and Rn + link test) shouldn't be done from the back of a socket or other outlet on the ring. As...
To whom this may concern,
hello i would like to apply for all the electricians or electricians mates vacancies i am currently in college one day a week finishing off my electricians course which i started ten years ago and did not complete (2001-2004), i had to leave the course in my last year...
I have a query around installing a socket outlet spur off a final ring circuit in a domestic installation which isn’t protected by any RCD’s at the DB. My understanding is that to comply with the current regulation the cable installed in the wall would need to be in the prescribe zones (which it...
I'm hoping some of you guys out there on the forum can perhaps provide the benefit of your experience with the below issue:-
Currently working on a job where the garage which is approximately 25 - 30 feet away and adjacent to the house, has its power fed to it via SWA connected off the back of...
Hi,
I am studying for me 91 and am currently practicing on my home. I have found that my garage circuit consisting of a small 2 way CU with 1 of each; ring and lighting circuit (no RCD). I expected to see this circuit connected to the main CU through its own CB but in fact it is connected to...
I was speaking to an Electrical Engineering suit not too long ago,
He reckons that there's talk of Ring Final Circuits being done away with and the preference to install Radials only.
Anyone else heard this little gem.
Whats the general preference of everyone for the two systems????
Anyone...
I have been asked to wire a garage its an new dwelling ,the client is wanting to change the garage into a dining room / play area for the kids , in the garage there is already a double skt but its half way up the wall it will pull back and could be used for a wall mounted tv skt , is it...
I have been asked to wire a garage its an new dwelling ,the client is wanting to change the garage into a dining room / play area for the kids , in the garage there is already a double skt but its half way up the wall it will pull back and could be used for a wall mounted tv skt , is it...
So the powers that be have decided that it's too late to include an isolator within the new smart meter, great!
A perfect opportunity to provide solution to an ongoing problem wasted! What's the point???
My money's also on the chances that when the part p consultations come out it will be...
I am carrying out the continuity for a ring final test for a single phase TN-S system. When doing the end to end Neutral I don't get a reading!! What is wrong here and what Code does apply (Code 1-3)?
Many Thanks.
Can we carry out the continuity test for the ring final by connecting the line, neutral, and cpc end to end at any socket or do we have to identify and disconnect the conductors at the C/U? I am aksing as i think it is much easier to link the line, neutral, and cpc end to end at any socket...
Hi People, Interesting one today, friend wanted me to do check on 2 Circuits of his extension.
And he said LBC told him they would be happy to have PIR/EICR Considering it was 16th when he extended.
He done work 5 years ago ! which i thought was a odd thing for LBC to say, but they still...
Just a quick clarification, I am thinking of replacing a T&E switch wire with a 3+E switch wire as an easy way to convert a single light switch to a double light switch without ripping out the wall.
This would mean that there would be two cores as switched lines, one for each light.
I am fairly...
Hello,
Can anyone suggest the best possible way of getting the money back off a customer who won't pay?
It's a conservatory company we worked for installing all the power for it.
It's been ongoing since February and I have took a very down to earth approach about claiming the money back.I...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc