Lads
Can you please advise on the all the docs required to get registered as an MCS insaller. Also would really appreaciate if you have any useful docs to assist us getting registered.
[email protected]
Many Thanks
Chris
Hi Everyone,
So i finally came to the decision to make my exit out of the Solar PV industry and move onto other things.
I have got a buyer who has been a surveyor for a National Solar PV company and has decided to take the reigns of his own venture.
My only question i have which i think i...
Im sorry to moan, but just need to let of some frustration at the amount of PV suppliers sales calls i get here, and that's in addition to the 10 or so emails that come through. I even had a German number phone the other day with a Chinese guy on trying to flog me panels - unless im missing...
Hi all, I decided not too renew my MCS, and now a job has come up for a 50kw, if anyone is interested in doing the electrics and commissioning etc, please e - mail with rough price, this is in the Carmarthenshire area.
[email protected]
Cheers
I have been keeping an eye on the number of new and total companies registered for PV, the last fortnight seems to show that more companies decided not to re-register as those that registered for the first time, its only small numbers which equates to just six extra companies added to the total...
The title says it all really, he says that he never registers installations with the DNO unless they are over 4kW.
Every forum I have read says that DNO registration is part of the installation process as much as registering with a supply company for the FIT.
Is there a concise statement of...
Hi guys. Heed some advice from those that have had their annual review...
I have my first annual review this week. Have to show one job which is all sorted but what exactly are they looking for on the paperwork side. I have documented info on quarterly meetings. I have documented some...
Just a warning - I registered a job this morning and when I finished registering the job the screen kept going back to the last page of the registration instead of the screen that says the certificate has been printed. I clicked on the finshed button again - and you guessed it I've been charged...
Thought I'd post this up here to show that there are obviously many companies that still believe in the UK solar market. The growth of new PV installers isn't as fast as the end of last year but it's still growing at a fair old rate.
Seaward solar mcs toolkit for sale. Kit consist of:-
solar installation pv100
solar survey 100
seaward clamp meter
mc4 & mc3 test leads.
carry bag and calibration certificates.
this was bought on 20th march 2012 from test meter.co.uk for £1074.00 I have receipt.
Serious offers around £800.
You...
Seaward solar mcs toolkit for sale. Kit consist of:-
solar installation pv100
solar survey 100
seaward clamp meter
mc4 & mc3 test leads.
carry bag and calibration certificates.
this was bought on 20th march 2012 from test meter.co.uk for £1074.00 I have receipt.
Serious offers around £800.
You...
Hi Guys,
I am getting fed up of all the bloody Trade Price list coming through on my email, and having to filter through them to all the time. Any idea how to stop this?? or how to remove my email from the MCS Database?
I always respond asking to be removed from the mailing list, but it never...
Does anyone know any panels that are around 600mm or less wide? I've been searching everywhere and can't seem to find anything.
Any help would be appreciated
Hi Guys,
Got a 10Kwp install to do, split over 3 phase on two buildings next to each other.
i will have 3 single phase inverters, connecting into a different phase each. I will put 3 x single gen meters (one fore each inverter) as each building has its own sub main.
How would i go about...
Wondered if anyone could shed some light on the following;
'add method for adding or removing suppliers & products/materials based on pervious dealings, past history and product approval.'
How did you satisfy this requirement, do you have a points system in place, or is it as simple as saying...
Been waiting for over an hour again for our last MCS certificate. After 2 previously chaotic deadlines and the reduced number of installations going through why on earth can't they get their act together and get the database sorted!!
Is it an MCS requirement for both the AC isolators to be of the rotary type and to be lockable in the OFF position and where can I find details of this, anyone has a link???:dizzy2::dizzy2:
Just trying to find out what requirements the MCS place on solar PV companies. A few come to mind but are they requirements or recommendations? Would be good to see a full list, does anyone know of one?
1. SAP calculation
2. Structural calculation
3. Correct system design
4 Panel testing...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc