mcs | Page 9

mcs

  1. S

    NAPIT Certification Scheme Napit/MCS non-conformity

    Hey guys. Just had my annual MCS Inspection by Napit. Plain sailing apart from the assessor minutely investigating my Handover Pack. Anyway, I came away unscathed apart from; Refer to DTI guide 2006 clause 4.5 and add missing information on operation and maintenance to handover pack. Forward to...
  2. S

    NICEIC MCS installer scheme

    Does anybody know if this fufills the requirement for Part P registration, or do you need to be a domestic installer as well therefore have to pay for both? Also how do elecsa and NAPIT compare to NICEIC, both cost and working with them? Any pro's or cons you can throw at me and i'm all ears...
  3. G

    for sale mcs starter kit

    I have for sale my mcs starter kit that i fitted on my garage to pass my mcs 2x sharp mono panels nur245j5 panels 1x soladin 600 inverter will take 600 watt schuco mounting system for pan tiles rail fixings and and roof hooks Cost over 1100+vat sell for 600 including vat bargain Gordon
  4. M

    Panel Availability; MCS accredited or not ?

    Can I / anyone purchase solar panels? I'm looking for 3 x 220 watt, 29V ish, 8A ish for a boat charging system. I'm an electronics engineer but not MCS listed, and tried a wholesaler , but no joy on a sale due to this fact,,,,has anyone got and spare panels, new, staffordshire ? thanks.
  5. S

    NICEIC MCS inspection...Last minute tips please!!

    Hi guys, We have our mcs inspection tomorrow with NICEIC. I have the folder ready etc. Just wanted any last minute tips or any questions you were asked so I can prepare myself!! Thanks very much!! :)
  6. R

    MCS for Heat Pumps

    Evening all. This may be of a strange request but we are a south yorkshire based MCS registered company installing PV systems but are looking at adding air source heat pumps to our company. As you will all know in order to become MCS registered you need a job under your belt to be assesed on...
  7. S

    MCS Accreditation help!

    We are installing our 1st install for our MCS, its under 4kw so ive been told we dont need to contact or inform my energy provider until after the install? How long after the install do I inform them? Do I need any forms etc to send them? Who do I contact? Do I contact them as soon as its...
  8. D

    Hi New here looking for some information regarding MCS

    Hello This is my first post on here although I have been looking through the forum quite a bit as its a very good resource for microgen information. Just to clarify I am not a qualified electrician so some dumbing down may be needed. I am currently starting the MCS process for a heating company...
  9. R

    MCS for Heat Pumps

    Evening all. This may be of a strange request but we are a MCS registered company installing PV systems but are looking at adding heat pumps to our company. As you will all know in order to become MCS registered you need a job under your belt to be assesed on, basically i'm trying to find...
  10. L

    MCS company for supply and fit

    Hi All, Project II time. Nothing definate at this time, but I might have two projects in the new year, one in Berkshire (Reading area) and one Cornwall (Penzance) - if you are able to give keen pricing & work in these areas - both for simple roof mount projects sub 4kW, then can you drop me an...
  11. S

    MCS wind/weight loading advice sought

    Hi We have just had an MCS inspection and have been advised that we need to get independent wind/weight load assessments on each roof we install on, even if it is a new roof. The assessor said that this section of MCS was open to interpretation but may be something they insist on in the...
  12. D

    export meters, just an MCS to fit them?

    Just wondering what people's experience is of fitting export meters. We've put a few in & had no problems but I know some electricity suppliers are insisting on only certain companies fitting their customer's export meter (not 'just' an MCS accredited installer..). Has anyone had any...
  13. M

    mcs or part p compliance?

    evening all! i've done some sub contract work for an mcs reg company, mainly ac circuit, connecting inverter and isolators etc. nothing to do with the roof work. will the 'main contractor' require a part p compliance cert from me, or will his MCS registration cover all? thanks in advance!
  14. N

    first mcs fit form

    Had no problems filling in form untill your meter details on type of meter.I guess this would just be ....1 phase elster generation meter. Sending by email to british gas and am i right all they want is invoice.copy of mcs cert and fits form Thanks Graeme
  15. T

    Latest from Gemserv on MCS database issues

    9th December 2011- To all MCS Installation Companies We are well aware of the pressures installation companies will be coming under from customers who believe their certificate won't arrive on time, and that their FIT application will be compromised. That's why we're working hard to...
  16. R

    No MCS Self installed system- why would you do it!!!!

    Had a guy ring up a couple of days ago who was a local electrician who had put a system on his own house and was looking to get it signed off for the MCS. We've never got into this before but it was local and we agreed to have a look on the understanding that we took no responsibility for...
  17. N

    Mcs log in problem

    Hi Cant log in to register my own install.Got my log in password and user name through today and wont work.Is this because system is to busy or did anyone have same problem first time Thanks for feed back Graeme
  18. H

    MCS inspections

    We have been MCS accredited for over two years now and nobody has been and audited or checked anything we do. We are with NICEIC and they do yearly checks/ inspections on our electrical work but never on MCS stuff yet. Has anybody has a yearly audit and/ or do they ever take place. Thanks
  19. A

    Mcs QMS - Internal Audit

    Hi guys I am currently in the process of applying for Mcs Accreditation and am creating my own QMS document as opposed to buying one in. One area we have not previously done but are now looking into is the internal audit section. Just posting to see if anyone could maybe help out and point me...
  20. F

    MCS broke

    Anyone else getting the following? A network-related or instance-specific error occurred while establishing a connection to SQL Server. The server was not found or was not accessible. Verify that the instance name is correct and that SQL Server is configured to allow remote connections...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top