I'M not very clued up on PV supplies and I don't get involved in it.
So perhaps if there are any PV experts someone could help me out with this one.
A customer of mine is a landlord who owns several office units.
Each office unit has its own sub meter which he uses to invoice his tenants...
Can there only be ONE electricity suppliers meter per incoming supply. Ie if you had an incoming 3 phase supply to a landlord common area which fed a rye field cut out and then supplying individual apartments can each apartment have an electricity supplier of their choice or would they have to...
Hi guys.
I am keen to connect with any electricians with any experience or knowledge of installing industrial smart metering devices.
Initially this request is primarily for a brief discussion and some fact finding on my behalf really. A little background to the request,is that I am software...
threenine
Thread
electric
electrical
electricians
energy
metering
monitoring
sought
Recently more than once in PE and even on here I've heard about sparks finding red main fuse carriers with only an aluminium tube inside, and not the expected fuse.
now i come from an electricity company background, but never came across this in the 11 years I worked in that part of the...
Hi All I've been asked by a landlord to give a quote for some work he requires doing. He has a house that is converted into 5 bedsits. At the moment there is one single supply and one consumer unit. Lights are on up and downstairs circuits and there is a separate socket ring circuit for each of...
hello everyone.
i need help here
im now create kind of model of substation for my project .the device and component already given which is put in the panel.
now im hope everyone can help me to check whether my single line diagram are correct?
sorry the image
Just been talking to Eon about export metering for a 50kW and was told that it would be £600 for the first year but that you can only get export payments for 5 years. I didn't think this was the case about the 5 year cap, has anyone else been told this?
Need to work out if export will be...
if there is a 3 phase suplply but only single phase meter, does i cosst much for 3 phase meter to be installed..?? do all charge what they want? do i have options?
Dear all I wonder if you can help please:-
I have a customer on a farm who has 3 x 5 total 15Kw of wind turbines installed foc by wind crop, I am assumining windcrop claim the deemed export rate of 50% of the wind FIT meter reading.
The customer has now been in touch with me as he would like...
Do you know if split metering for separate power and lighting can be supplied for small 4 or 6 way consumer units. I am looking at a job that has a large number rooms and the client wants split metering for the power and lighting. I had proposed installing a small CU in each room.
A large dis...
adammid
Thread
board
circuits
consumer
lighting
metering
meters
power
split
I know this is not associated with PV but I really needgood advice and from what I have been reading you’re the guys to ask.
If the provider of electric installs a faulty meter andfor 2 years does not realize the fault is there, can the electric company claimloss of revenue after the contract is...
Hi, recently called to a local industrial unit, Basically theres a car showroom and two smaller industrial units, At the moment theres one 3 Phase head (100A) running all three units, The car showroom currently pays the bill and the two smaller units pay a set amount towards it, (however im sure...
E14RKS
Thread
3 phase
electricians' talk
metering
meters
phase
please
smaller
three
units
Hi, im after some clarification on the tariffs for a second array please. Basically there is a 16kWp array istalled on a college early last year, the college now want a second 30kWp array on the same building, what tariff rate would they expect to recieve for the second array? Also wondered if...
matt25
Thread
advice
array
electricians' talk
metering
second
tariff
Hello everyone:
I have just started to working in a project of energy efficiency in buildings and I always see references to a monitoring proyect and metering proyect separately but in my opinion these two are the same thing, you need a metering project to have points with measures, and we need...
Hi after some wise words.
We have got a 40Kw install to start in 2 weeks, just a bit unfamiliar with the export.
Can some one confirm the procedure we have had acceptance of our G59 Application with the DNO no witnessing required G59/2 Inverters.
Does my customer have to have an export meter...
Anyone know what the best metering setup is for a system of 250kW? Doing the G59/2 application and Looking at using 2 x inverters with a peak AC output of 122A/phase and 2 x inverters with a 46A peak ouput/phase. Should I meter each of the big one seperately on dedicated circuits and then meter...
Morgan keith
Thread
connected
electrical work
electricians' talk
job
meter
metering
meters
phase
I MISSED THE LAST THREAD LIVE AND NEUTRAL REVERSE
these metering guys only do 2/3days training they are not qualified people just proven to be competent in there ridiculous days training
I finished a 2nd fix on a new hse whilst waiting for a meter to go on in the same week,all i had left to do...
Just a warning to anyone out there looking to get in to metering . It's a good little earner but stay away from G4S Utility Services as they are a bunch of liars .