months | Page 2

months

  1. Dan

    Solar Thermal Performance During Winter Months? Solar Thermal Forum

    During the summer months I'm sure solar thermal performances are pretty decent, but what about the winter months?
  2. Sintra

    Electrician Jobs Electricians Jobs SW6 - Electricians needed London SW6

    2 x electricians required for high end commercial project near Earls Court. Would prefer self employed but PAYE can be considered. This work will last for 6 months for the right people. Must have completed a full apprenticeship and hold a valid ECS or CSCS card. C&G 2391 would be desirable...
  3. R

    Pat tester not long passed 6 months need to clarify the Extension lead test

    Been a while since I done a PAT test on a 20meter extension cable and kinda forgot how to do it. The calculation I mean.
  4. A

    Questions about XS Training

    Hi all, I have finished my C&G 2365 and 17th Regs in my college last year. And I have looking for a job ever since, but there's no hope. Luckily, I have a chance to work along a sparky for work experience. In this forum I have come accrossed quite a lot of people like me who has completed...
  5. Leo_chaos

    2365 level 2 done !

    Finally, 2365 level 2 is done, after a massive panic for the 202, couple of bits of paperwork we need to sort, but all exams finished and passed. Nice to have a couple of months with no stress until level 3, apart from updating CV and sending it to everyone remotely electrical related haha...
  6. T

    Testing in schools

    Does anybody do any work in private schools? We do quite of lot of work, but SEB have a test and inspect contract in the school. Which we do any remedial work that is required after. They have said that they want RCD testing to be done every 4 months! Has anyone heard of this or do this?
  7. S

    Hows work load

    How you finding things a the minute work wise? Busy? Just ticking over here, lost out on 3 quotes this week for CU changes to the local cheapo doing them for £200 all in. Looking forward to the Xmas break mind you :)
  8. B

    New 20% VAT Rate for Solar

    Does anyone know when this actually comes into force. Is it from last Thursday or when the VAT man tells us. I phoned them but to no avail. See: Domestic solar facing 15% VAT hike following EU ruling | Solar Power Portal
  9. infinity

    new Megger

    I'm looking at splashing out in the 1730 Anyone know who sells them at the best price? Il also be selling my 1553 if anyone's interested its in immaculate conditions till well looked after and about 9 months calibration left
  10. Simon-0116

    domestic rhi forms pros and cons

    Hi doing barn conversion for parents. Fitted air source heat pump. Applied for rhi payment but bit stuck. Want to no if ocupied for 6 months or not. If not get a meter or more than no meter. Would i benifit from having a meter or not. Any ideas
  11. J

    Working outside UK

    I have recently returned from 12 months work in Afghanistan (July-July) due to contract not being extended. I am after a bit of advice, if anyone knows of anywhere outside of UK where there may be work. After being in Afghanistan for 12 months, I will seriously consider anything, ha ha. I have...
  12. J

    Megger 1552 repair?

    Hi all, sent my 1552 back to megger to be repaired. It's giving inconsistent continuity readings. Megger wanted £385 just to look at it! Robbin *******s! Do I asked for the meter to be returned. can anybody recomment a meter repair company? thanks.
  13. T

    NICEIC Certification Scheme Going for NICEIC Registration at long last.

    At long last I am finally getting around to applying for NIC approval. I've been meaning to do it for ages but "other " stuff kept getting in the way and delayed the application. I've just been re reading the Guide and one part has me worried. There is a paragraph that says: "How you have...
  14. S

    MCS 012 Delayed for 3 months

    No surprise there ... MCS 012 delayed by three months | Solar Power Portal
  15. whinmoor

    MCS 012 Pitched Roof Installation Kits – Extension of 3 months

    Probably good news overall for installers but annoying for those manufacturers who managed to get their gear certified in time. They must be spewing that their competitors are being offered a chance to catch up! *********************************************************************************...
  16. HappyHippyDad

    What am I responsible for - returning to a customer?

    Evening all.. I have had my first customer call me back (messgae left) saying that something is not working as it should! Its too late to ring him back but it sounds like the PIR is not working correctly on a flood light I installed perhaps 6 months ago. Its bound to be a faulty PIR as it was...
  17. C

    4-Noks Elios4you Android app not working properly after 3 months

    I tried to put the review below on Google Play, but had to reduce the words considerably. I would appreciate experiences/observations regarding this product. Is there a better alternative? Thanks. Since mid November (3 months) we have used the Elios4you app to monitor our solar panels, based...
  18. C

    3 months old 4-Nocks Power Reducer broken - who's responsible for fixing?

    Mid November our solar panel fitters purchased an Elios4you system from Greenologic, with a Power Reducer to heat the water, and fitted this for us with solar panels. On 13th February the Power Reducer started to take electricity from the grid instead of from the solar panels. We had to switch...
  19. uksparks

    Guarantees On Workmanship

    Hi, Just a quick one, does anyone ever put anything in writing or even say to a customer if they guarantee the installation they have put in, for example, rewired a house. Do you ever say the cables are guaranteed for say 10 years by you parts and labor under normal conditions, excluding...
  20. C

    Flooded areas, increased work?

    Are any of you guys benefiting from increased work where areas have been flooded? I was expecting a deluge (Pardon the pun) of remedial work but not much so far. Shades of the broken window fallacy, but work is work!

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top