Hi lads
just doing a quote for some newbuild flats just outside the M25 (mainly studwork internal walls by the looks of it) and wondered what the going rate is for a socket/switch/FCU etc
Ive currently gone with £50 per point but the total has come in pretty high and im thinking of dropping...
Hi lads
just doing a quote for some newbuild flats just outside the M25 (mainly studwork internal walls by the looks of it) and wondered what the going rate is for a socket/switch/FCU etc
Ive currently gone with £50 per point but the total has come in pretty high and im thinking of dropping it...
New build housing project in the middle of a very hot summer (anyone remember both those things?) so everything is bone dry. One of your colleagues did the first and second fix so you have the job of testing IR is down just under 2 meg.
Discuss.
Hi all
Got to price for a new build bloke of 3 flats. irst time I have quoted a new build so was thinking three days first fix and two days secound fix does this sound about right?
The flats are two bedroom with three sockets in each room and centre light just basics really nothing fancy. I...
Hi all,
I was hoping for some advise on wiring the above switches, I have knowledge of vehicle electrics etc but didnt want to attempt this before speaking with you guys for guidance.
My house is a new build (2 years old)
I have a ceiling light in my living room with 2 seperate switches...
Hi all, Could someone please advise me whose responsibility it is for connecting main BT point on new build, also where would you say is the ideal place for putting all aerial cables and boosters, just having a little dispute with builder, thanks guys
Hi all,
Have been given an opportunity to price for a new build housing development.
Not an area I have much experience in & was wondering peoples thoughts etc on hours per first fix & 2nd fix for a standard 3 bed property? & what sort of charge out rate to apply?
Doing a new build now (conversion from House to flats), just got a few questions
Supplementary Bonding - using a 17th ed CU with 30mA RCD - Main bonding at origin of water and gas - Supplementary Bonding yes or no?
Meter Tails- Meter tails are on show in meter cupboard downstairs and running...
I have just had a quote excepted for the wiring of a conversion of a block of flats, has anyone got a template for a written contract between electrician and customer please?
If anyone can help me with this please pm me
Thanks in advanced
Do current building regulations allow you to chop into a parting wall on a new build e.g a 47mm box for a cooker outlet ? Would it still pass building control ?
Just been to a property (new build) and saw this:
Full list of problems:
· The outlet pipe from the toilets terminates in the attic directly next to the extractor fans for both bathrooms, the condensation from this pipe has leaked all into the extractor fans where a puddle had formed –...
We are quoting on a new build that is unlikely to be fully complete by august 1, the roof will be on and we will be able to commission.
Can an EPC be completed from the plans prior to completion? Can the tariff be retrospectively updated once an EPC rating is acheived? (it will be well above D...
I have 3 new builds to do in September - I am fine with quoting the price and everything but I dont have a clue on how long to allow on each.
I cant aford to under guess on these as I have 3 of them to do in 1 month - dont know if its possible. - I will have a mate on the job with me.
I have:
2...
Hi folks
I’m in the real early stages of planning my new build house. I’m trying to keep my bills to a minimum and be eco-friendly, if I can. I’m interested in having all my electricity provided by solar panels or as much as possible, or with other renewable energy sources.
The house area has...
Hi all,Got a problem here with a new build extension to an older property.I will want to use this for my assessment soon so i am fretting about getting this spot on.I am running a new ring circuit upstairs in what will be a bedroom.I am familiar with safe zones but my question is..sockets that i...
I understand VAT on new build is 5% but does that mean that i have to charge the builder 5% for my services as a sub contractor or should i just charge 20% as normal?
Hi There,
I'm in the process of buying a new build from Barratt Homes in North East England. Upon looking round the show home the fuse box was located half way up the wall inside the store cupboard under the stairs. However after looking around the plot we are interested in buying, the fuse box...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc