I haven't come across this yet but it's only a matter of time.. If I am doing a prework survey and come across a code 1, I have to leave the installation safe. If I haven't got the job yet am I going to have to bill the customer after the survey and immediate remedial work?
As the survey is...
i am quoting to install a 3.80kwp system on a old farm house, do i need to contact the DNO as it is the only house which will have it installed.
and as it is going to be installed on the house roof and connected to the domestic supply will that get the 41.3 fits
I went to look at a job today,
im not self employed and work for a company. The work is notifiable. and needs to be done this weekend.
I am looking for advice on the legal side of things as i find it all so confusing!!
How long does it take for the ball to get rolling via building control...
Hi folks,
am in the process of joining napit awaiting my dreaded "site visit "" and would like to know what to do about my notifiable work regarding the process of notification to buidings control ?will the assessor need to see that the work has been notified to builings control and...
hi guys
i am in desperate need of a electrical danger notification for tommorrow morning has any one got a copy of one they can email me? a long shot but mybe with a elecsa logo?
pretty please
A good friend of mine has run a question by me, but I can't be 100% certain in my reply to him, nor can I manage to quote specific regs, so I open the question to the forum.
He currently has a freestanding gas and electric oven (old skool type with gas oven, electric hobs, and gas overhead...
Can any Elecsa registered help with this ?
I'm doing my first set of notifications on-line. Very simple of course but two of the questions are;
1. Was commissioning required yes/no 2. Was Commissioning carried out yes/no.
What do they mean of this? I understand commissioning within...
hi, i have recently got the niceic domestic installer scheme.Iv done a job for a customer extending a lighting circuit indoors not in a special location.Iv produced an niceic minor works cert to the customer. My question is as this work is not notifiable does it still need to be registered on...
Hi, I have just bought a bungalow and am rewiring myself, along with fitting a kitchen, bathroom and a general update of décor. I have been off the industrial spark tools for 15 years but have 17th edition.
The place has a large workshop that I just don’t have the time to complete to a really...
Hi. For the last 30years I have worked as an electrician in industry. I have recently been made redundant. I have used my time to gain the C&G 2392 qualification and am due to start on the C&G2391 course. I am thinking of going self employed as a lot of people have been asking me to do work. I...
I'm sure this has been discussed umpteen times, but should building control agree to sign off notifiable work if it has been installed by a competent, qualified, but not scheme registered installer or are they in their rights to request that work must be installed by NIC Elecsa etc registered...
Hi all,
A colege d of mine asked me to inspect a work he has done in his bathroom. Some lights and maybe a socket as well. He would like me to inspect it and sign the required certificates for it.
Now, I am not a member of any organization like NICEIC or NAPIT so can I do that? But I am a...
Hey up, quick question, how long do you get to notify work that comes under part p? Are you supposed to do it within a certain amount of time after the completion date? Sure i read it somewhere.
Thanks.
rang the labc the other day and have received there pack through the post i just need to get some blank certificates one for a cu change and one for a spur at my parents house does anyone have a link to a template for a minor works and a domestic installation certificate ( think this is the...
Whirlpool bath - Notification to building control.
I'm currently in my 3rd year of C&G 2330. I'm not 'in the trade' so to speak but I am doing various bits of work to get site practice.
So far, all my work has not needed notifying to LABC, I tend to stay away from those sort of jobs.
However...
hello people
happy new year and all that
does anybody know if the taxman is likely to have a look at the amount of jobs you have notified to building control through napit/nic etc.
if you tell them you're a member do they have the right to check
mmm???
i wonder???
cheers
Hi, all ways read the forum, lots of very good advice. Just getting ready to start-up alone.
One of the questions that I would like help with is:
Who is responsible for LABC notification of electrical work to be carried out? There is nothing in black and white to pin-point this.
We know...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc