A good friend of mine has run a question by me, but I can't be 100% certain in my reply to him, nor can I manage to quote specific regs, so I open the question to the forum.
He currently has a freestanding gas and electric oven (old skool type with gas oven, electric hobs, and gas overhead...
Can any Elecsa registered help with this ?
I'm doing my first set of notifications on-line. Very simple of course but two of the questions are;
1. Was commissioning required yes/no 2. Was Commissioning carried out yes/no.
What do they mean of this? I understand commissioning within...
Pete@HGE
Thread
certification
certsure
commissioning
elecsa
notification
part
part p
questions
scheme
Hi, I have just bought a bungalow and am rewiring myself, along with fitting a kitchen, bathroom and a general update of décor. I have been off the industrial spark tools for 15 years but have 17th edition.
The place has a large workshop that I just don’t have the time to complete to a really...
Hi. For the last 30years I have worked as an electrician in industry. I have recently been made redundant. I have used my time to gain the C&G 2392 qualification and am due to start on the C&G2391 course. I am thinking of going self employed as a lot of people have been asking me to do work. I...
I'm sure this has been discussed umpteen times, but should building control agree to sign off notifiable work if it has been installed by a competent, qualified, but not scheme registered installer or are they in their rights to request that work must be installed by NIC Elecsa etc registered...
Just
Thread
aus
building
building control
certificate
control
installer
notification
registered
Hi all,
A colege d of mine asked me to inspect a work he has done in his bathroom. Some lights and maybe a socket as well. He would like me to inspect it and sign the required certificates for it.
Now, I am not a member of any organization like NICEIC or NAPIT so can I do that? But I am a...
Hey up, quick question, how long do you get to notify work that comes under part p? Are you supposed to do it within a certain amount of time after the completion date? Sure i read it somewhere.
Thanks.
rang the labc the other day and have received there pack through the post i just need to get some blank certificates one for a cu change and one for a spur at my parents house does anyone have a link to a template for a minor works and a domestic installation certificate ( think this is the...
Whirlpool bath - Notification to building control.
I'm currently in my 3rd year of C&G 2330. I'm not 'in the trade' so to speak but I am doing various bits of work to get site practice.
So far, all my work has not needed notifying to LABC, I tend to stay away from those sort of jobs.
However...
Steve D
Thread
arial
aus
bath
being
building
building control
control
installation
notification
steve
hello people
happy new year and all that
does anybody know if the taxman is likely to have a look at the amount of jobs you have notified to building control through napit/nic etc.
if you tell them you're a member do they have the right to check
mmm???
i wonder???
cheers
Hi, all ways read the forum, lots of very good advice. Just getting ready to start-up alone.
One of the questions that I would like help with is:
Who is responsible for LABC notification of electrical work to be carried out? There is nothing in black and white to pin-point this.
We know...
Hi
I am in the process of setting up my own electrical contracting business and i was wondering how you get round notifying work for Part P whilst the application goes through for a competent persons scheme.
Obviuously i could notify building control directly however the cost of this is...