I am currently in the process of becoming self employed, i have contacted the NICEIC and will be joining there approved contractor scheme, however until i have achieved approved contractor status how do i notify domestic work to building control? You need a minimum of 5 jobs available for the...
Hi, im going to show my own cu change for my elecsa assessment (same one that was cancelled a few weeks back). I have not notified building control as im thinking once im registered i will just sign it off myself. Is the elecsa assessment guy going to want to see some proof that it has been...
Hi all,
Basically, someone in my family needs a new board ideally and I was wondering, as im not registered with nic, nappit etc am I in a position to change this board and sign it without having to pay a crap load of money to labc. or would to change it and test it but not sign it be a...
"anyone carrying out work on a domestic property that would be subject to Part P regs has to notify Building Control by some means. A contractor registered with one of the government-approved schemes can issue a Building Regulation Compliance Certificate to both the householder and Building...
Hi everybody
I want to register with niceic domestic installer scheme. They advised me to do two jobs (fully installed, inspected tested and certified) under the name of my business. I am fully qualified to do insp/testing (2391) but for certification i have to go through council. When i...
I am a competent electrician and have all of my certificates, nvq3 etc I have also passed my 2391, can I sign off domestic jobs or do I need to do part p etc?? I am not with the nic eic or a governing body either, some people say I can and some say I can't
Hi people,
When notifying work on the niceic website I pay £1.50 to notify it then £1.50 for a guarantee. My question is can you get rid of the guarantee payment and how? Im doing a lot of single circuits for a new contract so although it doesn't seem a lot it will quickly add up over time...
Is there a way to find out if a job has been notified/pending to building control eg.online or is the only way to wait for the actual certificate to be posted to the customer cheers
Hey,
Just joined up after having my MCS assessment this weekend (which went well!) and have one or two questions I could do with some help with!
I use paperclip software for my MCS (which I have to say is very good), but have noticed that for each job, one of the tasks which I have to complete...
Am I doing right by issuing and EIC before my assessment with napit and being able to notify it if and went I pass. I've heard this is true but doesnt seem right
Hi Guys,
We have a request to install 15 Suntech 245's (3.68kWp) on a due-South facing, 35 degree pitched roof in Devon.
As the Suntech's have power output of up to +5%, I feel an SB4000-TL would be a good match.
Would I still need to do a stage 2 application, or as the array is only 3.68kWp...
We are installing our 1st install for our MCS, its under 4kw so ive been told we dont need to contact or inform my energy provider until after the install?
How long after the install do I inform them? Do I need any forms etc to send them? Who do I contact?
Do I contact them as soon as its...
OK all - here's the scenario I had today. What paperwork do you fill in?!
Existing installation, single dwelling. Incomer had been fed from an intake elsewhere > RCD > SWA > Tails > CU Mainswitch > 16th board.
So.....intake is moved to be closer..... intake > Tails > RCD as replacement for...
Hi all. I just passed my accreditation with the NICEIC as PV installer, so this is to introduce myself and to seek all your wisdom on something I can't fathom. Apologies to all if this is covered on previous posts, but I couldn't find it.
Having done my own (small 6 panel ) PV system as my...
We are an NICEIC approved contractor, but we dont do domestic work generally, we do industrial predominantly with the odd office here and there.
Anyway, I'm the QS for our firm (17th ed, 2391 cert etc) and have converted my loft into a bedroom, new stairwell all finished. Its all been above...
Have been completely rewiring a house where the builder (owner) has totally gutted the place. The only thing original is the outside walls. He's a retired guy and is doing the work to move into the house himself. Long story short, he tell's me he hasn't got any planning permission for the...
Just installed my first Pv installation and am handing over to the customer. Am i missing anything from list below?
Handover manual
Notify on Gemserve site.
Notify part p