override | Page 2

override

  1. N

    Am2

    Hi, I am looking at an application for an ECS card. It is asking for C & G 2360 parts 1 and 2 and an AM2? I have City and Guilds A and B certifictaes passed back in 1978,(currently retraining and getting back to speed, completed the ECA assessment yestreday, 17th Edition in Feb and Inspection...
  2. I

    din rail timer, light switch override for outside lights

    I am looking for honest advice. I am a newbie but fully qualified domestic installer but have never done this install before. I have an MK timer switch MK 5731s (din rail mount) an MCB for outside lighting (with RCD protection). for cables I have a three core + earth running from the CU to the...
  3. S

    timer and pir

    hi custumer wants a timer to keep security lights perminately on till 11, then a p.i.r to switch them on after 11 when activated, got any ideas or could someone be so kind as to draw a diagram. thanks
  4. E

    Photocell with manual override

    Hello, Have been asked to fit some garden LED light fittings, supply will be coming from fused spur, total load less than 1A. The customer wants a photocell switch fitted but also ability to override and manually switch on/off when desired. Anyone dealt with this before, would you have any...
  5. M

    Landlords override switch

    Ive been having a look at this wiring diagram and i understand the function of the overide switch but i am not sure about how the emergency key switch is wired in this diagram. Is the diagram wrong? surely the neutral should not be wired into the switch but the line at the light instead...
  6. P

    central heating override

    Got a customer who wants to lock his vaillant eco tec boiler controls up and over ride the central heating with a remote 60minute manual reset timer. He says that tenants just put it on constant and leave it on - then they open windows when it all gets too hot. Anyone got an idea across which...
  7. S

    AM2 Landlords Over-ride?

    Hey there... Another quick question on the AM2 if anyone knows? On the Lanyards override circuit, Do I take 1 feed from the common on my first switch to the common on Lanyards switch and then take another feed from the common on the other switch to L2 on my Lanyards? Would this be the correct...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top