Im doing a past 2391 Paper now, a question has come up - dont think it applies to 17th regs but want to check
State the correct title of the protective conductor that is connected between two extraneous conductive parts
Am I right in saying this is the bonding between the water pipes and...
hi,buddies today was the 2391 written exam and i must say that it was a fairly eassy paper, and i'll be disapointed if the national average success is gone to be as low as the december 2011 one (37%)
Hi all I'm just filling in my test paper work but I can't fill in the section charteristics of primary supply overcurrent protective device because the main fuse is sealed and all it says on the outer casing is 100amp. Does anyone have the contact num for the electricity board so I can clarify...
on your Second MCS visit
Is this based still around the ONE solar pv job you will take the assessor to later in the day.
IE Quotes/Sap - Contract - Surveys- Wind Cals - Roof Cals based around the single job?????
or
Will the assessor need access to all documents for all jobs you completed...
Hi there,maybe anyone has the copy of ELECSA complaint log paper on pc and would be able to forward it to me, would be much appreciated, assessment in couple days but the pack hasn't come..Been looking everywhere through google but couldn't find one.
Urgently need someone to do 2 x g59s ( the inverters are g83 compliant ) so I will sneak them through dno must be completed prior to 12 noon friday will pay cash mark 07866 777 474
have recently sat my fica! waiting on results but had a howler of a multiple choice paper!
i revised for weeks for about 15 questions that i reconised and 15 that i had to look up or take an educated guess at! does anyone know how this paper is marked???
i have heard different things i.e.
55%...
I know a roofer that has a spark and a labourer and are keen to install solar PV. He has requested that he subcontracts my services as an MCS installer out to allow them to get certified. Does anyone know how I can do this within the scope of the scheme and what paper work I need to generate...
First i like to thank my mum for being there for me through thick and thin and of course you guys ! for all the advice and love....! ahhahaha LOl
So yeah actually passed. Elecsa assess. David Goddard. lovely guy ...the dude has a serious head on him....but very accommodating. Not what i...
Hey guys I've got 301 in two weeks time and I've been given some past papers will post some more soon hopefully. feel free to have ago and post your answers :)
1: Who is the Electricity Regulation at Work applicable to?
a: Agricutural premises
b: Anyone working within the electro-technical...
Hi all, I got given a past exam paper from the 2391 course tutor however it doesnt come with any answers so I thought id put the question and my answers on here to see if im going down the right track and also to help anyone else taking this course so please correct me if im wrong because I...
Basicly, on the REAL presentation of performance document it says :
A typical ‘x’ kWp PV system generates ‘y’ kWh.
Your system is predicted to produce ‘z’ kWh
is 'x' the size of the customers system (4kwp) & 'y' the tariff (43.3p/kWh)?
and 'z' the yearly power the system produces...
Good evening ladies and gentlemen,has anyone recently taken the 2330 303 written exam,the fault finding and rectification one if so any pointers would be most welcome.
Thankyou,Peter.
after completing the required remedial work (suggested onthe unsatisfactory pir the day before) on an installation, does a full pir need to be conducted again to show that it is up to scratch?
thanks