regarding | Page 7

regarding

  1. M

    panel query regarding protection

    I have received a panel built by someone else as part of a build I am carrying out. Unfortunately the customer has been involved in the selection of devices and wiring requirements however i feel there are a few things a miss. The mains incomer comes in on a 63A 16mm 5 core SY, through an...
  2. A

    Question regarding Dimmable Lights and transformers

    I have a Robus 70W dimmable transformer for MR16 12V bulbs. The transformer has 3 sockets, for three bulbs. Can I connect three Non-Dimmable 4W led bulbs to the transformer? Thanks in advance :).
  3. D

    Question regarding instant water heater fuse and main fuse box question

    Good evening all, I have two questions for you, which I would very much appreciate input on :>) 1: I have a Stiebel Eltron DHC hydraulic instantaneous water heater in my toilet room, next to my bedroom. It has not worked since we moved in two weeks ago. It has a switch spur in close proximity...
  4. J

    Confusion between RECC and MCS regarding sub contracting?

    Simple question, can an MCS company use non-MCS subbies and I get two different responses: Any views on the forum about this? From MCS via email: "Thank you for your enquiry. If a MCS certified company contracts another company ("Company B") to install the electronics, the company ("Company...
  5. T

    Query regarding old 2391 question - RE sequence of tests

    Hi, I've been having a nose through some of the old past Chief Examiner reports and the December 2011 edition has on page 5 has the following quote: Can anyone explain why Continuity of CPC is not the first test? Is it purely because if you get an end to end reading on the CPC then that is...
  6. D

    Question regarding isolation.

    I installed a 3 phase distribution panel and i had to prove safe isolation for my NVQ level 3 (working with a qualified electrician) i only had to isolate one circuit. But theres a small sticker saying main switch isolated before removing cover. This wasn't required to isolate for the job in...
  7. P

    regarding supply for a fire panel.

    hi guys, I hope im in the right place to ask these questions. (im a newbie to forums) I have been asked to fit a double pole isolator from a dedicated supply so a fire company can fit a fire alarm system. would this be certified on a regular EIC or would I have to use a some other...
  8. M

    new builds regarding MCS paperwork & any payments

    Hi all just been asked today to price for 2 blocks of flats with landlords supplies having solar pv. (not the flats) also 60 new build houses with solar pv & solar thermal. colleague doing solar thermal & is MCS for that. he mentioned that would need MCS paperwork for build control for each...
  9. A

    Query regarding rules on certification

    Hi This is a bit long winded, but just to explain the full story. The question is at the end :) My ex has had no hot water and only temp heaters for four weeks due to a broken common biomass system that feeds 54 houses. As a temporary solution they have installed a peak off peak immersion into...
  10. B

    Any advice regarding courses etc appreciated.

    Hello I'm 34 years old and have been struggling to get into the electrical trade since about 2009 when I first started looking into it. Had no luck whatsoever, so here I am on here yet again trying to pick your brains for more of your advice. :smile5: What I'm after is becoming an electrician...
  11. D

    Various issues regarding EICR on a MASSIVE industrial installation

    Afternoon. Ive just finished testing a very large industrial installation, made up of 5 units, and have come across various problems whilst there, and even more whilst filling in the form on the computer. I am 2330, 2392, 2391 and 17th update qualified so yes I know what Im talking about and...
  12. P

    Question on Faults regarding RCBOs (Trainee)

    I've got a test and one of the key questions on it is as follows; 230v Single Phase Circuit is protected by a circuit breaker with integral RCD(RCBO), Justify which competent part of the device would operate for each of the following faults: A) Line to Earth Fault of approx. 2.3 Ω B) Line to...
  13. N

    Help please,advice regarding the way electric shower has been wired and left

    Hi people, as title says, my local council has been installing new kitchens and bathrooms, all electrical cable was fitted at the start of the build (4 weeks ago) The plumber put shower on the wall last week, next morning electrician came to my door saying " you've got a problem with your...
  14. P

    help regarding long meter tails

    Hi just after a bit of advice,we are wiring a new build where the meter is, the tails will be coming from outside into the kitchen they will be coming up the wall to the ceiling along the the middle of the joists to the consumer unit in the wall what is the best way to do this 1) shall i run...
  15. S

    Query Regarding 2 Systems On 1 Building

    We've been approached to install 2 small systems on a new build development - 2 flats contained within 1 building, but independent supplies. The available roof space is limited and the builders are asking if we can install the 2 systems in a continuous run - eg so they appear to be one system...
  16. N

    Question regarding filling in extent and limitation. Please help.

    Hi I am trying to fill in the Condition Report Inspection Schedule for Domestic Premiss with up to 100 A Supply. I have a question regarding filling in the Section (5.10) That states Concealed cables installed in prescribed zones. My installation reference method is B and there is no way of...
  17. N

    Question regarding filling Section K of Electrical Installation Condition Report.

    Hi I am trying to fill in Section (K) of Electrical Installation Condition Report. My question is when we have faults like: High Insulation resistance on a certain circuit that i know, High resistance of main bonding that i identified, Zs too high for ring, ring discontinuous and incorrect...
  18. N

    Question regarding filling in the box for verification of Main bonding Conductor.

    Hi I am trying g to fill in the Electrical Installation Condition Report, section J. my question is regarding checking the boxes in the section Main protective Conductors. If I have a high value for main protective conductors say to incoming water. What happens to the box Connection /...
  19. N

    Question regarding Insulation resistance test.

    Hi I am still training and have a question regarding Insulation resistance test. My question is when doing the test between live and earth at the consumer unit, what happens to the circuit breakers? On or OFF? Many thanks.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top