  1. N

    Question regarding filling in the Schedule of test results. Please Help.

    Hi I am trying to fill in a Schedule of test results for a domestic installation. I have one question: When filling in the the sheet under the section Overcurrent protective device what goes in the "Type" part? Is it acceptable to just say TYPE B or do i have to get the whole number like B...
  2. E

    Fun fun fun - it's a tax question regarding CIS

    Hello lads, Fun one for Sunday night for all of yoooz. I am starting work under the CIS scheme in not too long. Now I know that you can ask to be paid gross or net. I went for NET because I decided I'd rather have it this way and it's a bit of a hassle to get the gross payments and save money...
  3. R

    regarding protectice and instrument earth

    hi all i have a doubt regarding protective earth and instrument earth .i had a screen cable which is terminated inside jb and from there that 4 sq mm wire going back to the instrument earth bar,there is one more protective earth lug which is present in equipment where should i terminate that...
  4. R

    regarding contactor

    is there any contactor available with tripping facility ,because i need to run a fan which takes around 2 to 3 a and am using a contactor 20a and the supply is 63a does it effect the contactor kindly help
  5. R

    regarding contactor connection

    how is contactor overload rating differs from its contact current rating
  6. R

    regarding mcb and rcd

    if my rcd comes with overload protection still can use the mcb and how is the sequence can anyone help
  7. R

    regarding cable tray layout

    can anyone help me with earthing and grounding of cable tray with separate instrument and power
  8. J

    Need Help Regarding 10kVA Traffo

    Hi All, I will be installing a dual voltage traffo to support a workshop. The traffo will supply both 110V and 220V DB's that will both have their own circuits. The customer has requested now that I install an extra 110V Industrial Skt to the existing 110v DB. My plan is to install an...
  9. T

    NICEIC Domestic Installer Scheme - help & advice needed regarding assessment please

    Hi, first of all im new to this forum so apologies in advance for any mistakes regarding my post, just after some friendly advice. Im looking to become an NICEIC Domestic installer and i have a few grey areas, obviously i dont want to make any silly mistakes that are going to cost me and effect...
  10. A

    Argument need settling regarding CU Swop

    So been working for a mate of mine for a while now and just had a query today.. I changing a consumer unit, and I told him I need an Adaptable box, some din rail and some din rail connectors to joint out the cables as they will be too small. He said just crimp them inside consumer unit. Is...
  11. N

    Question regarding neutral for Ring final Circuit.

    I am carrying out the continuity for a ring final test for a single phase TN-S system. When doing the end to end Neutral I don't get a reading!! What is wrong here and what Code does apply (Code 1-3)? Many Thanks.
  12. N

    Question regarding Continuity of Ring Final circuit.

    Can we carry out the continuity test for the ring final by connecting the line, neutral, and cpc end to end at any socket or do we have to identify and disconnect the conductors at the C/U? I am aksing as i think it is much easier to link the line, neutral, and cpc end to end at any socket...
  13. N

    A question regarding filling the new PIR.

    Hi I am trying to fill in PIR (Periodic Inspection and Reporting Cert.)for a single phase TN-S system. I have one question in the section (Recommendation) it asks for the the installation is further inspected and tested by ........ What date do we put? If it was Unsatisfactory what do we...
  14. O

    discussion regarding new industry initiatives regarding professional standards and ..

    Here's the full title: "discussion regarding new industry initiatives regarding professional standards and support for electricians" Anyone else had a call re this and asking if you'll agree to go on an Online Discussion Group early in July??
  15. N

    A question regarding filling the new PIR

    When filling the Condition Report Inspection Schedule For Domestic And Similar Premiss With Up to 100A Supply, section 5 (Final Circuits), the part that states: "Concealed cables in cooperating armour or sheath, or run within earthed wiring system, or otherwise protected against mechanical...
  16. N

    Questions regarding testing for Main/Sub Distributor board.

    My test examination board is domestic (single phase) and has two Distributor boards (D/B), one the main one with the main switch feeding a sub D/B, and the other one is external (sub) distributor board with no main switch but they are RCD protected and is fed by the main D/B. My question is when...
  17. N

    More questions regarding Filling the Condition Report Inspection for Domestic 100A.

    I am trying to fill in the Condition Report Inspection Schedule for Domestic 100A. I have my exam coming up and having some problems filing the Section 6 of this form. In Section 6 " Locations Containing A Bath or A Shower". My test Board (Domestic) has only a shower unit and no Shower Cubical...
  18. N

    Question regarding filling the Condition Report Inspection Schedule. Please Help.

    I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply. My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...
  19. L

    Feedback regarding ratedpeople.com and other similiar schemes

    Hi just after some info on how useful these schemes are and if anyone has any feedback on the pros and cons,thanks.
  20. D

    Current situation regarding FiTs and new installs ?

    Hi - is there someone who could kindly just summarise where we are with new installs from Jan to after April please in a concise format ie. what rate they will start on and continue with after certain dates and what other processes have to be undertaken such as an EPC 1. Solar PV fitted...
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Advert

Back
Top