  1. N

    Question regarding Continuity of Ring Final circuit.

    Can we carry out the continuity test for the ring final by connecting the line, neutral, and cpc end to end at any socket or do we have to identify and disconnect the conductors at the C/U? I am aksing as i think it is much easier to link the line, neutral, and cpc end to end at any socket...
  2. N

    A question regarding filling the new PIR.

    Hi I am trying to fill in PIR (Periodic Inspection and Reporting Cert.)for a single phase TN-S system. I have one question in the section (Recommendation) it asks for the the installation is further inspected and tested by ........ What date do we put? If it was Unsatisfactory what do we...
  3. O

    discussion regarding new industry initiatives regarding professional standards and ..

    Here's the full title: "discussion regarding new industry initiatives regarding professional standards and support for electricians" Anyone else had a call re this and asking if you'll agree to go on an Online Discussion Group early in July??
  4. N

    A question regarding filling the new PIR

    When filling the Condition Report Inspection Schedule For Domestic And Similar Premiss With Up to 100A Supply, section 5 (Final Circuits), the part that states: "Concealed cables in cooperating armour or sheath, or run within earthed wiring system, or otherwise protected against mechanical...
  5. N

    Questions regarding testing for Main/Sub Distributor board.

    My test examination board is domestic (single phase) and has two Distributor boards (D/B), one the main one with the main switch feeding a sub D/B, and the other one is external (sub) distributor board with no main switch but they are RCD protected and is fed by the main D/B. My question is when...
  6. N

    More questions regarding Filling the Condition Report Inspection for Domestic 100A.

    I am trying to fill in the Condition Report Inspection Schedule for Domestic 100A. I have my exam coming up and having some problems filing the Section 6 of this form. In Section 6 " Locations Containing A Bath or A Shower". My test Board (Domestic) has only a shower unit and no Shower Cubical...
  7. N

    Question regarding filling the Condition Report Inspection Schedule. Please Help.

    I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply. My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...
  8. L

    Feedback regarding ratedpeople.com and other similiar schemes

    Hi just after some info on how useful these schemes are and if anyone has any feedback on the pros and cons,thanks.
  9. D

    Current situation regarding FiTs and new installs ?

    Hi - is there someone who could kindly just summarise where we are with new installs from Jan to after April please in a concise format ie. what rate they will start on and continue with after certain dates and what other processes have to be undertaken such as an EPC 1. Solar PV fitted...
  10. S

    Change in the Law regarding RCDs in Rental Properties

    I have been in contact with my local AM about the need for a legal requirement for all rental properties to contain RCDs to protect against electric shock, she fully agrees with myself that this is a requirement which needs to be brought inline with the requirements that are imposed with Gas...
  11. T

    regarding 17th edition

    Hi there guys can someone tell me where is the best and cheapest place in london to get my 17th edition done. i got 16th so i need to do day refresher. regards George
  12. N

    Question regarding dead polarity test. Please Help.

    Hi I am bit unsure when carrying out dead polarity test on a one way switch and two way switch. Where do the test probes go and on what? Do we make contact at the switch line and the cpc of a ceiling rose? or do we contact at the line and cpc at ceiling rose? What happens in two way switch...
  13. N

    A question regarding filling the Electrical installation Certificate.

    If I was the inspector When filling the Electrical installation Certificate under Declaration For Inspection and testing, I only need to sign this part? Also what do i put in the space for amended to ..?....(date) except for the departures, if any detailed as follows. What date goes in that...
  14. A

    regarding sub contracting

    hi we are new startup company installing solar and just wanted to find out if anyone knows how much would an electrician and roofer would charge to carry out the installation of solar pv. I look forward to hear from you soon thanks
  15. D

    Looking for some technical insight regarding Voc and Isc of panels

    Pretty much as the topic suggests. Having seen many a graph regarding open circuit voltage and short circuit voltage on panel data sheets I am keen to fully understand exactly what this means. Thanks
  16. N

    Questions regarding polarity and continuity for a light circuit.

    I am trying to find out where on the light switch or the celling rose of a light is the test for continuity and polarity are carried out? If continuity is carried out for a light circuit then where the probes connect to? is it on the switch line and the cpc at the ceiling rose or the brown...
  17. N

    Question regarding PFC, Ze, and live polarity tests. Please help.

    When carrying out the tests: live polarity of the supply, Ze, and PFC on a TN-s single phase system, what happens to the double pole main switch? is it off or on? Many Thanks.
  18. N

    Question regarding live polarity test. Please help.

    I am trying to carry out live polarity test to test correct polarity of the supply. The system is TN-S and single phase. My question is do i turn main switch off? Where on the main switch does the voltage indicator leads go? Is it on the top side of the main switch (Supply) or bottom (Feed)...
  19. SolarCity

    Question regarding removing panels and reinstating them

    I have had a customer phone me and he has intends to install some PV panels in the next few weeks. He then intends to remove them, rebuild the house and reinstate the panels. No problem there. He then asked about the tariff he can expect. Will he drop to the new build tariff or stay on...
  20. W

    2391 questions regarding surge protection devices

    Hello, I would be grateful if anyone could check my answers for those two questions and see if it's correct or not? State the a) tests for insulation resistance to be undertaken on a 230V circuit containing surge protection devices which cannot be disconnected Test between L-E, L-N and L-N b)...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top