Can we carry out the continuity test for the ring final by connecting the line, neutral, and cpc end to end at any socket or do we have to identify and disconnect the conductors at the C/U? I am aksing as i think it is much easier to link the line, neutral, and cpc end to end at any socket...
Hi I am trying to fill in PIR (Periodic Inspection and Reporting Cert.)for a single phase TN-S system.
I have one question in the section (Recommendation) it asks for the the installation is further inspected and tested by ........ What date do we put? If it was Unsatisfactory what do we...
Here's the full title:
"discussion regarding new industry initiatives regarding professional standards and support for electricians"
Anyone else had a call re this and asking if you'll agree to go on an Online Discussion Group early in July??
When filling the Condition Report Inspection Schedule For Domestic And Similar Premiss With Up to 100A Supply, section 5 (Final Circuits), the part that states: "Concealed cables in cooperating armour or sheath, or run within earthed wiring system, or otherwise protected against mechanical...
My test examination board is domestic (single phase) and has two Distributor boards (D/B), one the main one with the main switch feeding a sub D/B, and the other one is external (sub) distributor board with no main switch but they are RCD protected and is fed by the main D/B. My question is when...
I am trying to fill in the Condition Report Inspection Schedule for Domestic 100A. I have my exam coming up and having some problems filing the Section 6 of this form.
In Section 6 " Locations Containing A Bath or A Shower". My test Board (Domestic) has only a shower unit and no Shower Cubical...
I have a question regarding filling the Condition Report Inspection Schedule For Domestic Up To 100 A Supply.
My question is when carrying out the inspection on my examination test board there is a shower Unit with its circuits but no shower cubical and there is no bathroom or bath basin or a...
Hi - is there someone who could kindly just summarise where we are with new installs from Jan to after April please in a concise format ie. what rate they will start on and continue with after certain dates and what other processes have to be undertaken such as an EPC
1. Solar PV fitted...
I have been in contact with my local AM about the need for a legal requirement for all rental properties to contain RCDs to protect against electric shock, she fully agrees with myself that this is a requirement which needs to be brought inline with the requirements that are imposed with Gas...
Hi there guys
can someone tell me where is the best and cheapest place in london to get my 17th edition done. i got 16th so i need to do day refresher.
regards
George
Hi
I am bit unsure when carrying out dead polarity test on a one way switch and two way switch. Where do the test probes go and on what?
Do we make contact at the switch line and the cpc of a ceiling rose? or do we contact at the line and cpc at ceiling rose?
What happens in two way switch...
If I was the inspector When filling the Electrical installation Certificate under Declaration For Inspection and testing, I only need to sign this part? Also what do i put in the space for amended to ..?....(date) except for the departures, if any detailed as follows. What date goes in that...
hi
we are new startup company installing solar and just wanted to find out if anyone knows how much would an electrician and roofer would charge to carry out the installation of solar pv. I look forward to hear from you soon
thanks
Pretty much as the topic suggests. Having seen many a graph regarding open circuit voltage and short circuit voltage on panel data sheets I am keen to fully understand exactly what this means. Thanks
I am trying to find out where on the light switch or the celling rose of a light is the test for continuity and polarity are carried out? If continuity is carried out for a light circuit then where the probes connect to? is it on the switch line and the cpc at the ceiling rose or the brown...
When carrying out the tests: live polarity of the supply, Ze, and PFC on a TN-s single phase system, what happens to the double pole main switch? is it off or on?
Many Thanks.
I am trying to carry out live polarity test to test correct polarity of the supply. The system is TN-S and single phase.
My question is do i turn main switch off?
Where on the main switch does the voltage indicator leads go? Is it on the top side of the main switch (Supply) or bottom (Feed)...
I have had a customer phone me and he has intends to install some PV panels in the next few weeks. He then intends to remove them, rebuild the house and reinstate the panels.
No problem there.
He then asked about the tariff he can expect. Will he drop to the new build tariff or stay on...
Hello, I would be grateful if anyone could check my answers for those two questions and see if it's correct or not?
State the
a) tests for insulation resistance to be undertaken on a 230V circuit containing surge protection devices which cannot be disconnected
Test between L-E, L-N and L-N
b)...