Hi Guys,
This is my situation:
Existing brick building demolished and replaced with steel frame, steel panel clad warehouse/storage structure.
Original building had two electrical supplies:
1 x 63A single phase and neutral via 3 core PVC SWA PVC
1 x 100A TPN via 4 core PVC SWA PVC plus equal...
I am running some flexible conduit within a 5mm steel box profile dwarf wall to feed socket outlets In a small conservatory. One of the sections is 2 box sections bolted together. The flexible conduit will run through this but I'm not happy with the conduit just pushed through. I was thinking of...
Wondered if anyone can advise here please by any chance.
When making a running coupler where one end of your steel conduit has a bend, so turning it to make a fixing would be impossible, it seems apparent that how ever way you do it you will be left with some thread left over on the steel...
I have a large, portable steel framed tank. approx 6m x 2m x 2m. It is used for actors/models to perform in for a variety of productions.
For many years now, I have had conflicting advice about whether or not it should be earth bonded. The initial response is "it's a giant steel structure, bond...
Iv used this bender for allot of 20mm galv jobs and its worked fine. Im currently doing a job that involves 25mm galv conduit so iv changed the former and steppes up the roller and arm into the appropriate holes. Every bend i do the conduit keeps showing small wrinkles at the start of the bend...
Hello!
Got a few jobs on the way that involve large amounts of conduit work. All surface mounted and will mostly be mounted externally around the building.
I was just wondering if anyone has any good tips, tricks or good points to think about when doing it to be quicker and more efficient...
Just fitted some 10 Low Bay Led all wired in steel trunking. Have just noticed my volt stick light up on 3 cables that are not even connected to anything. Gets volt meter out and I've got 38v on it. Seems a hell of a lot. Anyone else found this with LED power supplies
My builders have left a 20mm gap above the steel beams supporting the new first floor by setting the timber joists 20mm above them.
Is it acceptable to run cables through the gap and over the beams?
Cheers
Dave
good afternoon guys
I have a 95mm 4 core swa to this new office build , thats fed via a new exterior mains panel located next to a new sub station.
now all feed cables on this project have been designed by an independent company, and i currently have flagged up that i believe that using just...
Carrying out some EICR on a commercial/industrial site.
Previous records state the structural steel is bonded, and visually I can see 4x 25mm Earth wires leaving the main earth bar, I cannot trace the one going to the steel , though I suspect one of these does.
How do I prove this? Is it a case...
Hi all, hope everyone is well.
I'm looking for a replacement cooker control Unit similar to the one in the picture. I am after a brushed steel or satin one, but I cannot find one anywhere with these vertical dimensions. The tiles behind the socket have already been cut to fit this shape by a...
Hello,
Can anyone recommend a good quality 20/25mm conduit die set? After looking online prices seem to vary quite dramatically. I Want something solid that will serve me for many years to come,
Thanks
Judd
hi have a large workshop to price, standard stuff, but i noticed that the steels 4 of which are not bolted together so in a sense offer 4 earth fault paths, i would plan to export suitable earth/cpc conductor from house to bond the frame but should i bond each steel back to consumer unit(in...
Hello everyone
I'm picking up some remedial works from an EICR fail in a commercial property.
Its a 3 phase supply with old steel conduits , trunking & coupled metal equipment, that provides the earth to the various locations.
At present the earthing is insufficient, every earth in the...
I was wondering if any of you have any experience burying galvanised steel conduit?
My current plan is to make up the conduit, T-Wash it and give it a couple of coats of primer and hammerite before I sink it in the ground but I'm wondering if it will be enough? My Father has suggested covering...
I have to install roughly 150 points at a large property. The client is style conscious and wants to install Brushed Steel / Chrome / Nickel Flat plate sockets and switches.
Is BG Nexus a good and sturdy brand? Not shoddy quality like LAP which keep falling off / failing. Mainly worked with MK...
Yo guys,
More than likely some of the older boys (naming no names) may have used a lathe once or twice, for machining little parts and bits and bobs on your home projects?
Looking at broadening my horizons and add some feathers to a pretty bald cap.
Cheers,
HW
Can anyone point me in the right direction to find out the CSA and resistance of 20 & 25mm steel conduit?
It's for part of my 2396 project where I'm using the conduit as CPC, I'm happy enough with the calculations I just need some numbers to work with.
I've tried various manufacturers websites...
Hello,
Got some stainless conduit to do in the next few weeks,
I was wondering anyone with experience with this...
I mean have you used your normal stock and die for threading? Maybe a fresh die if its getting a bit old in the tooth? Plenty of cutting compound of course, was just wondering...
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc