those | Page 5

those

  1. K

    Cooper/scantronic technical advice ( only to those who they deem worthy!!!!)

    As you may have noticed from my previous post I had a problem with a scantronic I-on 16 panel. i phoned technical and they agreed that it was the panel at fault fortunatly I had my touchpoint number to hand (coopers version of a PIN number) without this number you cannot get through to...
  2. T

    Bubble Bursts on those installing Solar Thermodynamics

    We briefly looked at this technology and decided that there was no evidence to support claims being made for it. Got this letter from MCS about half an hour ago: "17th October 2012 Dear Solar Thermal Installer MCS has recently become aware of a number of products that are being sold into the...
  3. M

    Rcd size

    Hey can you please explain rcd size. Garage cu it comes with 6amp mcb plus 16 amp mcb with 63amp rcd. While same cu bought else where maybe have 40 amp rcd and another 25 amp rcd.
  4. D

    Hot Tub Installation (con'd) !

    Further to my last post I finished the hot tub installation today. In the end I hammered in 2 earth rods but still couldn't get below 200 ohms! So .............. Re-assessed the install and decided that the hot tub was double insulated, there were no extraneous/exposed conductive parts in the...
  5. O

    RCBO for this CU?

    Being lazy (yes I know) but I'm so, so busy at the mo! Need to find a 6A RCBO to fit this board, can anyone point me in the right direction? Thanks......
  6. K

    how many 2.5 single core in 28mm conduit?

    how many 2.5 single core will fit in 28mm conduit?
  7. S

    Multi-installation FiT Rate

    The Phase 2A consultantion is not clear on the multi rate, i.e. above 25 installations. Does anyone know whether you would receive the higher rate for installations 1 to 25 (i.e. those registered first) and then the reduced rate for those instalations 26 onwards OR the lower rate for all of...
  8. SolarCity

    One of those surveys

    I've been to do a survey on a home local to ourselves. We are one of many people that have been to see her (always a concern) and the amount of crap that she has been told is incredible. First of all, and the thing that mainly got my back up, was a question that I was asked about the size of...
  9. Strima

    Screwfix stock levels

    No wonder they've never got any decent stock levels... http://www.youtube.com/watch?v=knnFXsN2Vgg&feature=youtu.be
  10. S

    Wind loading as per BRE489

    I know this has been covered before but is anyone here still doing this themselves? F=qs x Cp net X Ca x A ref 2 x 980 x 1650 panels = 3.3m2 Qs = 1243 (take from key zone chart in bre495) Pp net = -0.7 & 1.0 Ca = 1.0 (as per recommendations) A ref = 3.3m2 uplift = -2871.33N downwards =...
  11. richy3333

    New Megger rain cover

    Fed up with those erratic loop tests? Does your 1700 series MFT cry at the thought of rain? Well have no fear, buy the new patented 1700 MFT rain cover! Available now on an auction website near you, priced at £69.99 (terms and conditions applicable, always read the small print, not to be used...
  12. La Poste

    Clever those Japanese

    Researchers in Japan have smashed the record for wireless data transmission in the terahertz band, an uncharted part of the electro-magnetic spectrum. The data rate is 20 times higher than the best commonly used wi-fi standard. Electronic component firm ROHM demonstrated a 1.5Gb/s (1.5 billion...
  13. Strima

    Computer LAN party setup

    Evening all. Been approached by a mate of mine to possibly set up power distribution for a gaming LAN party. Being of the domestic ilk this is a new one for me. He's already looking at various locations including conference centres etc but we need to look at his power requirements. The event...
  14. F

    DECC reveals disappointing April installation figure

    DECC reveals disappointing April installation figures | Solar Power Portal As we all predicted ....
  15. B

    Any one completed the job write ups for their JTL Portfolio???

    Hi people,, I have finally completed my 3years at college and so far done all the underpinning knoledge questions apart from my job write ups and my AM2. Is their anyone out their that can possably send me a copy of thiers or an example sheet so that i can get an idea of what needs to be put...
  16. O

    Dam those hidden junction boxes

    Been out to a call out this afternoon to a house with most of their downstairs lights not working. Owners say they "failed" at the same time that a bulb blew. So I've looked at each lighting point in turn and my conclusion is that above, (or there abouts) each and every light, is a hidden...
  17. M

    Need MCS Cert?

    You accreditation not going to be through in time? Need your install signing off? PM me. I will come and inspect then certify.
  18. S

    Stroma Certification Scheme Stroma

    So...... has anyone joined? Looks favourable. 430 odd for NIC bit less for ELECSA or NAPIT 245 for STROMA same end result (you're legal and can notify - THATS IT!) ?
  19. SolarCity

    Solar Century letter to David Cameron

    AN OPEN LETTER TO THE PRIME MINISTER - Solarcentury
  20. SolarCity

    Free Solar

    One of the good things to come out of the FITs cuts is that the fat cats will move away from installing the free solar. Also, those that have had the free installs will actually be in a more attractive position than it seemed they would be. I, like most of you, think that the suggested rates...

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top