I always been told that an 30m/A RCD should trip within 200m/s (x1) and 40m/s (x5). But something iv never taken much notice of before is on test sheet the maximum disconnection time of a circuit less than 32A is 0.4. So....which is it? within 0.4 or within 200m/s????
Hi Guys,
How do you wire an extractor fan within a lighting circuit? I have bought a 4in extractor fan i would ideally like to feed this through the lighting circuit. I have wired Lighting circuits and Ring Circuit at college but they have not taught us how to wire an extractors fan with timer...
What exactly are the neutral leads for? and if a neutral to earth happened on a board with just RCBO'S in it, why doesnt the fault travel along that neutral and affect the other RCBO's?
Hi I went to see a job this evening for a building firm that I do their electrical work for them reguarly.
The house was extended last year which comprised of a lounge and 1 bedroomabove. the elecrical firm installed a seperate ccu with RCD protection with one mcb for the ring main for the...
Hi
I've got a customer on a 2kW TIC system but he wants to go to the maximum 4kW. Fair enough, but does anyone know/have any experience of what would happen to the FIT rate. Is it 43p for the 0-2kW part (installed Feb) and 21p for the 2-4kW part?
How would MCS registration work? Just modify...
I was called to a customer today where the oven had blownup over the weekend. Well to be more precise the oven element had fractured and the moisture in the mineral had caused the element to pass current to earth. Now my understanding is that the RCD should have tripped out (which it did)...
Ive been given a question on "state how the electrical contractor may minimise costs, with particular reference to CASH FLOW?
I do not really understand how cash flow can minimise costs only that you ensure you price up a job correctly.
Please can you enlighten me on this question
Thanks
Mattysparks75
Thread
aus
before
cable
costs
electrical work
how to
invoice
job
materials
possible
within
Evening all,
Has anyone been fitting "Lamp & Gear" 4W LED's?
I've fitted quite a few, mainly in shop lighting to existing fittings, and have had a few failures, some within weeks. Some have been in downlighters and some in spotlight fittings (not enclosed).
Just wondering if I've been unlucky!
Hi all,
I've had a couple of enquiries lately from clients who have been (somewhat surprisingly) informed by their DNO that the generation meter is not Ofgem approved. Why, all of a sudden, are DNO's deciding that MID approval is not adequate/accepted? Don't they understand the history/nature...
was in a half finished house today that has just had an extension built on it, and i was suprised to see 10mm bonding to the steel RSJs that span the garage and where the kitchen has been knocked through and at the front where a porch has been created. traced them back to the MET, have all been...
Does anyone know what the tripping times for an Wylex bs 4293 100ma type s RCD are? Ive been searching the net and just keep getting more and more confused about this i know an bs6009/9 should trip within 130ms-500ms but cant make headway for the tripping times for an older bs4293 rcd.
If FIT payments were only for 15 or 20 years would this help with spending cap?
I was thinking of asking Greg Barker, via my MP, if he had considered reducing the period in which FITs are paid. In my experience most customers only really care about payback and simple ROI so if it went down to...
jerriais
Thread
allow
budget
current
fit
hopefully
level
new
within
hello. I was wondering if anyone could give me some advice to a simple question.
How long does it take from booking an assessment with Elecsa till having the assessment?
I'm interested in joining Elecsa but I just wondered how long people have to wait. any answer would be great.
A two storey extension has been built to side of a property. The supply is overhead lines which are clipped to the existing building with clamps on the ends from which the tails run to the meter.
The problem is these cables are now going to be above the ceiling of the ground floor extension (if...
jasew
Thread
aus
building
cables
extension
floor
overhead
these
within
Hi all
As above i am awaiting my assessment for A/C and i have six largish jobs ready to show, but in the application i noticed it says must be completed within the last six months, well my problem is i am only a sole trader and would find it near impossible to have enough jobs from enough...
Welchyboy
Thread
application
approved
aus
checking
electrical work
enough
months
within
HELLO ALL,
I'm after a 3.4kw storage heater Creda, dimplex, sunhouse, used but in good condition if possible. I will collect from anywhere within an hour or so's drive from Halifax, West Yorks'. Please send me a PM if you have something I may be interested in, cheers
hi all,
a local factory has had a new machine installed which meant their system couldnt handle the load so i installed a generator on the warehouse to run this separatley.
upon monitoring their current usage i noticed phase 2 to always be high, in some case peaked at 80 amps difference...
Im wiring up a new extension to a house and am installing smoke and heats in the new extension.
Am I obliged to put interconected smokes in the rest of the house?
Thanks
Si
sivoodoo
Thread
alarm
alarms
customer
rooms
smoke
smoke alarms
within
Best EV Chargers by Electrical2Go! The official electric vehicle charger supplier.
OFFICIAL SPONSORS
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc