18th Edition Bonding requirements | Page 3 | on ElectriciansForums

Discuss 18th Edition Bonding requirements in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Had a nosey round a house once, plastic water pipe hanging in a big arc from cellar ceiling joists, with a brass stock cock half way along, with a nice juicy 10mm G/Y cable clamped to it, also hanging in a big arc, back to the CU.

Clueless! :D
And why do we not have a photo - you know the forum rules . . . .
If we can laugh at someone else’s stupidity - We will!
 
I'm struggling to see what the point of the extra sentence in the new regs is?

It's changed nothing practical. All it's done is muddy the waters. How many people are going to take it as: 'If the water/gas comes into the building in plastic, then I won't carry out bonding'?
 
And why do we not have a photo - you know the forum rules . . . .
If we can laugh at someone else’s stupidity - We will!
Here's something similar I found a while back. The plumbing in the agricultural building had been changed to plastic, but the label says don't remove, so they didn't :)
Edit - pipe and clamp was sitting on the floor but still attached to the MET with that g/y. Unfortunately I'd tidied it up before the pic, sorry.
[ElectriciansForums.net] 18th Edition Bonding requirements
 
Last edited:
And yet again post removed by a certain mod without explaining why. Have the decency to say why it’s deleted even if it’s for your own adgenda
What do you mean by a certain Mod, I removed your reply yet had nothing to do with the previous exchange between pete and westy.
Your comment was removed for two reasons and that was because it did not help the situation and it is none of your concern.
It was an exchange between two grown men / members.
I'm pretty sure they are big enough and ugly enough to resolve whatever it was without your intervention.
 
Just to add to my last post, if you had bothered to read the notification on your deleted post , it clearly states reason for deletion as Not Helping.
 
And why no heads up on why it was removed until I complained
We've just cross posted, I've explained in my last post.
As for waiting for you to complain, that is utter rubbish I have only been logged in for 10 minutes. I replied as soon as I saw your comment.
 

Reply to 18th Edition Bonding requirements in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
373
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
939
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
Any metalwork connected to the MET could rise in voltage compared to true earth under an open supply neutral fault (on TN-C-S), and that would...
2
Replies
24
Views
2K
Testing and Inspecting if the right course is a very good qualification to have and if you are to become an electrician you will need a...
Replies
1
Views
72

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top