Can i scratch your head (bare in mind biggest i have done is 25mm 4core ?)
I am tendering for a big house new build
I think they already have 100tpn
(But in a kiosk 40m away from house)
And i think they are doubting its big enough now (they sent max demand table below)
So they are asking for a price for 200a tpn sub mains to house if they upgrade from 100a to 200a tpn.
Am i right that the swa from kiosk to house (40m through underground duct)
Will need to be 150mm 4c with a 120mm cpc
And its just bad design that the income is so far from the house and needs a swa sub main!
I am tendering for a big house new build
I think they already have 100tpn
(But in a kiosk 40m away from house)
And i think they are doubting its big enough now (they sent max demand table below)
So they are asking for a price for 200a tpn sub mains to house if they upgrade from 100a to 200a tpn.
Am i right that the swa from kiosk to house (40m through underground duct)
Will need to be 150mm 4c with a 120mm cpc
And its just bad design that the income is so far from the house and needs a swa sub main!
Attachments
Last edited: