i tryed clicking on it to see if i could get a free pint biff!
E54 ,

someone has stuck a tacky red e-pub sticker on your avatar !!
is this something to do with last nights' halloween ? trick or treaters ?
;-D
 
Back to topic, the ryefield board becomes part of the incoming supply once sealed so not your responsibility, is it?
Its installed before the meters or not ?
 
I hope that your local Authority has this foolish waiver in black and white on official company paper!! Since when does the DNO hold sway over fundamental safety, emergency, switching arrangements??



No, not unless you can provide proof!!!

Again, who is the person responsible actually instructing you to depart from BS7671?? Is he, or the authority taking the full legal and/or civil responsibility for this safety omission instruction, or are they going to pass the buck on to you, if or when that safety omission contributed say, to the loss of life and or the building??

To both of you, ....get an official written instruction my friends, and keep it in a long term safe place!!! lol!!

I still have around 12 to 14 written instructions, which i have insisted on, for work carried out against contract specifications over the years. One of which, came in very handy long before any court proceedings ensued!!!

So what reg/regs in bs7671 does this 'lack of isolator' contrevene? I am firmly of the belief that this installation should and does require one but unless i can back this theory with cold hard facts i will almost certainly be accused of ramping the job up needlessly.
 
To my mind the Ryefield board and it's supply are part of a 'system for the distribution of electricity to the public'.
As such they do not fall within the scoe of BS7671.

The Regulation that requires each installation to have an isolator is 537.1.4.
 
E54 ,

someone has stuck a tacky red e-pub sticker on your avatar !!
is this something to do with last nights' halloween ? trick or treaters ?
;-D

I Agree, ....It is ''tacky''!! Especially as no-one could ever call me a drinker, or a ''Pub'' man...
Didn't even realise it was Halloween yesterday, not something the locals here celebrate. They have their own Ghost festival, where they go to they're ancestors graves and leave food and paper money!!...lol!!
 
So what reg/regs in bs7671 does this 'lack of isolator' contrevene?

reg 537.1.4

quote ;

"At the origin of the installation a main linked switch or circuit breaker should be provided as a means of isolation and interupting the supply on load"

edit spin beat me to it lol.
 
To my mind the Ryefield board and it's supply are part of a 'system for the distribution of electricity to the public'.
As such they do not fall within the scoe of BS7671.


The Regulation that requires each installation to have an isolator is 537.1.4.

That's fine if this part of the installation is being carried out by the DNO themselves (or their designated contractor) under the scope of their own rules. But this is clearly not the case here, as far as i can tell from the two OP's, who rightly so, are following BS7671, ....or trying too!!!
 
To my mind the Ryefield board and it's supply are part of a 'system for the distribution of electricity to the public'.
As such they do not fall within the scoe of BS7671.

The Regulation that requires each installation to have an isolator is 537.1.4.

if the ryefield board is to become part of the supply / distribution equipment , then you'd think it would be fitted by the dno or its subcontractors rather than a private installer such as the OP.

and does this mean that if isolation or fuse replacement for individual units is required in the future , that the dno have agreed to undertake this task themselves ?

a strange and inconvienient set-up if so.

edit ; damn , beaten by e54 this time lol , blast this 1 finger typing.
 
in my experience , the dno's dont want to even take responsibility for their own earth connection these days , nevermind a buildings fuseboard.
 
It is no longer the case that the DNO or their 'designated contractor' always conduct the work required.
Even with standard new build houses, the contractor building the houses install meter cupboards and often underground cabeling.
Often all the DNO have to do is make off an underground joint in a supply cable down a hole that the contractor building the houses has dug.
 
It is no longer the case that the DNO or their 'designated contractor' always conduct the work required.
Even with standard new build houses, the contractor building the houses install meter cupboards and often underground cabeling.
Often all the DNO have to do is make off an underground joint in a supply cable down a hole that the contractor building the houses has dug.

the example you discribed above concerning new build housing is a million miles away from the scenario being discussed in this thread to be honest.
and as you admit yourself , the dno will want to make the final connections themselves for any equipment under their scope , which isnt going to happen with a third party fitting the ryefield board.
 
edit ; damn , beaten by e54 this time lol , blast this 1 finger typing.

I'm also, basically very much a one finger typing guy. Maybe i've been typing one fingered a lot longer than you, way back into the era of the desk top typewriters even...lol!!!


 
Last edited by a moderator:
It is no longer the case that the DNO or their 'designated contractor' always conduct the work required.
Even with standard new build houses, the contractor building the houses install meter cupboards and often underground cabeling.
Often all the DNO have to do is make off an underground joint in a supply cable down a hole that the contractor building the houses has dug.

I can understand what your saying here Spin, all this work being undertaken by the contractor to accommodate DNO installations would be via a well documented deal, brokered between the contractor and DNO to keep costs down for the contractor. But and it's a real but too, The DNO would have issued the contractor with a work specification schedule that the DNO would have been keeping an eye on too, via regular inspections checking on adherence to those specifications. In effect the contractor has become by de-fault if you like, a limited scope designated installation contractor...
 
I think a lot of this is probably down to semantics.
An installation would require an isolator, and an EIC, whereas a system would not.
As for the DNO making final connection, we don't know what has been agreed.
Obviously at some stage during the work, the system will require de-energisation.
It may be that the DNO will pull fuses, either in the intake room, or perhaps even at the sub station.
It will all depend upon what deal has been brokered with the DNO.

However at the end of the day, unless the individual meters are placed between the DNO head and the Ryfield board, this is a 'system to distribute electricity to the public', and as such the requirements of BS7671 do not apply.
 

Reply to 200amp isolator at cutout position. in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
305
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
825
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
919

Similar threads

Sooo the client has accepted that we don't want to be fraudulently taking electricity so that worry is out of the picture. But now basically the...
Replies
32
Views
5K
Adding a led strip isn't going to make much difference to the 3 phase balance. No real difference to where a 3 phase machine uses one phase to...
Replies
2
Views
322

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top