S
scott g
has anyone started or finished thier project for this course king richard house
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Discuss 2391 20 design project 2400 in the Electrician Courses : Electrical Quals area at ElectriciansForums.net
Do you still have anything on it mate?Hey.
Sorry mate my assignment was the jewellers warehouse.
I've still got all the notes and assignment I did for that if that will be any help to you.
Cheers.
Your own tutor should be avaialble for advice, however dont get bogged down with calcs for the pv panels,the requirement is to select from manufacturers data suitable equipment ie the inverter and isolation etc plus a detailed description of the 712 requirements
there are no details given for the output of the panels hence the equipment description will be general, hope this helps
hello bert
make things easier for yourself and identify positions for additional db`s there are 3 I have identified which will keep sub circuits shorter, eliminate grouping and make vd and Zs easy ti achieve
what wiring system have you chosen for the cafeteria?
[/QUOTE]hi,maddfridge.How long did you have to wait for the magical 2391certificate to grace your letterbox?I!ve been waiting over 2months now .dge;34023]hi there
As churchill says
ah Yessss
just waiting for the verification from city and guilds
passed
just waiting and waiting for that luverly certificate
cheers
Reply to 2391 20 design project 2400 in the Electrician Courses : Electrical Quals area at ElectriciansForums.net