Yeah i wasnt 100% sure either. waffled something just for a punt really. I also walked out and all sorts of stuff were going through my head, like the SWA termination inspection. Was it just after about the termination or the glanding? I ended up putting ID of conductors, tightness of terminals, presence of cpc, correct polarity and if the insulation was still intact. Not sure if that was what if it was after.
if i remember correctly it said inspection of swa cable and its conductors, 3 phase and neutral
i put correct identification of conductors by means of sleeving
banjo fitted correctly and earthed to earth bar
correct type of swa gland is used either interior or exterior
check is correctly and securely fixed
the shroud is in place to protect the gland from moisture
think about it this test is mainly inspections