25mm tails maintenance free joint | Page 3 | on ElectriciansForums

Discuss 25mm tails maintenance free joint in the Talk Electrician area at ElectriciansForums.net

Think about it though, if done correctly with 100a single pole blocks each conductor could be under 4 brass screws, with all those properly tightened and the blocks within an enclosure I honestly can't see a problem.
 
Think about it though, if done correctly with 100a single pole blocks each conductor could be under 4 brass screws, with all those properly tightened and the blocks within an enclosure I honestly can't see a problem.

In reality probably not - are you going to put your name on the paperwork then? :) Daz
 
In reality probably not - are you going to put your name on the paperwork then? :) Daz

If it was an EICR I'd put it as a code 3 with a comment Daz, I'd always use continuous lengths of tails on a new install though so the question doesn't apply in that scenario. :p
 
Think about it though, if done correctly with 100a single pole blocks each conductor could be under 4 brass screws, with all those properly tightened and the blocks within an enclosure I honestly can't see a problem.

The problem with standard screw terminals is the cable is subject to creep when they are first tightened, this is due to the copper shaping and equalising the stresses after tightening, this can leave the termination more susceptible to loosening with temperature variations and/or vibration over time.
It can effect larger core cables more so thus it is recommended to check all your dist' board connections at the end of the job, chances are you will find the tails need a tweak.
Other issues are cable movement which may act on the termination, if cables are clamped then not an issue. When you use MF connections or crimps then alot of these issues are reduced to a minimum thus considered safe to terminate and forget.
 
It's funny but I've always been a bit wary of crimps, just me I suppose. :)

Depends how you do them. I have always been a bit suspect of indent crimpers. There is too much margin for error when manually setting them and I believe the indent method puts too much stress on the crimp sleeve.

I have complete faith in a crimp made with the correct hexagon die in a decent tool though.
 
If it was an EICR I'd put it as a code 3 with a comment Daz, I'd always use continuous lengths of tails on a new install though so the question doesn't apply in that scenario. :p

how on earth would you know the connection is under the carpet, under the floor boards??

I'd be VERY impressed if you can spot a totally CONCEALED connection is such a location when doing an EICR!
 
It's funny but I've always been a bit wary of crimps, just me I suppose. :)

If you own a budget ÂŁ1 market crimper then I would just be as weary, if your crimper isn't subject to calibration or you have a set that doesn't require it then again I wouldn't consider them reliable. At a minimum you should be looking for a ratchet crimper for your standard insulated red,yellow,blue crimp lugs and small ratchet indent crimper for your uninsulated say 10 -16mm up to 25mm.
 
Last edited by a moderator:
Depends how you do them. I have always been a bit suspect of indent crimpers. There is too much margin for error when manually setting them and I believe the indent method puts too much stress on the crimp sleeve.

I have complete faith in a crimp made with the correct hexagon die in a decent tool though.


As have tool manufacturers such as Klauke and the companies which purchase and use them,such as BNFL and a dozen similar others...:lol:
 
how on earth would you know the connection is under the carpet, under the floor boards??

I'd be VERY impressed if you can spot a totally CONCEALED connection is such a location when doing an EICR!

Oh dear, the answer was hypothetical in reply to a question from DPG and based on the assumption that I was aware of the issue, nothing more than that.
 

Reply to 25mm tails maintenance free joint in the Talk Electrician area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
279
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
776
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
787

Similar threads

This was posted this week, on topic ....... https://niceic.com/newsletter/omission-of-overload-protection/?dm_i=7G1W,7GCE,K4L2A,WHET,1
Replies
8
Views
699
Yes the first bit is just standard wiring, TNS lead cable into cut-out, cut-out to meter, meter to DP isolator, top of isolator is sealed as per...
Replies
8
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top