- Joined
- Feb 20, 2011
- Messages
- 971
- Reaction score
- 433
Hi.
So get the cylinder changed for an unvented modern one, they have very little heat loss, and then replumb to have a mains pressure shower. The cylinder is then heated over a longer period with a 3Kw heater.
So get the cylinder changed for an unvented modern one, they have very little heat loss, and then replumb to have a mains pressure shower. The cylinder is then heated over a longer period with a 3Kw heater.