Hi Guys
I have been asked to price a job in a sun bed shop, the work would include adding a 3 phase + N DB and running 4 supplies to the new beds using SWA cable. My questions are as follows.
1. Is it ok to install a 3 phase + N supply in a shop where the general public have access.
2. Is it ok to put a switched socket outlet at the end of the supplying cable or should it be a switched fused isolator (socket would allow the shop staff to move the beds if required).
3. Should I include RCD protection to the outlets.
Any help would be appreciated as commercial is not my usual area.
Cheers
I have been asked to price a job in a sun bed shop, the work would include adding a 3 phase + N DB and running 4 supplies to the new beds using SWA cable. My questions are as follows.
1. Is it ok to install a 3 phase + N supply in a shop where the general public have access.
2. Is it ok to put a switched socket outlet at the end of the supplying cable or should it be a switched fused isolator (socket would allow the shop staff to move the beds if required).
3. Should I include RCD protection to the outlets.