P
PeteFT
Yes, the rails should be bonded to the MET - or to a seperate earth rod if the system is a TNCS set up (PME)
Sorry, but this means nothing to me. What is the MET and how do i know if the system is a TNCS set up, and which regulations can i point my installer at?