B
bullethead
Hi all,
I would appreciate your advice on a shower I installed in myhouse over the weekend.
Please note, whilst I carried out the installation I haveevery intention of having it properly checked over / signed off by aelectrician friend when he returns from holiday next week. The reason I am onhere is because something is not right and it will drive me mad wondering. I didconsider myself ‘competent’ having once been NAPIT registered myself but Iguess that might not be the case so please go easy with any abuse!
The shower is 9.5Kw, the cable is 10mm, approx 12m long, clipped direct towalls all the way except where it passes through a floor into the airingcupboard where it goes via a DP isolator switch on the inside wall of the cupboard.
Bottom line is, whilst I have 240v to the shower input terminals, it is notworking. Also, the operation of the isolator switch has confused me a little (interms of the neon status). I have attached a diagram of the installation alongwith more detail on what the neon is doing and would welcome feedback (andconstructive criticism).
Many thanks, B.
I would appreciate your advice on a shower I installed in myhouse over the weekend.
Please note, whilst I carried out the installation I haveevery intention of having it properly checked over / signed off by aelectrician friend when he returns from holiday next week. The reason I am onhere is because something is not right and it will drive me mad wondering. I didconsider myself ‘competent’ having once been NAPIT registered myself but Iguess that might not be the case so please go easy with any abuse!
The shower is 9.5Kw, the cable is 10mm, approx 12m long, clipped direct towalls all the way except where it passes through a floor into the airingcupboard where it goes via a DP isolator switch on the inside wall of the cupboard.
Bottom line is, whilst I have 240v to the shower input terminals, it is notworking. Also, the operation of the isolator switch has confused me a little (interms of the neon status). I have attached a diagram of the installation alongwith more detail on what the neon is doing and would welcome feedback (andconstructive criticism).
Many thanks, B.