T
thomas-1981
Doing my ACA on Monday.
Heard we should now be using rubber shielding and insulated crocodile clamps when doing a Ze.
How do you remove the earth cable and access the connections with this in place?
Can someone inform the procedure for this?
Cheers
Heard we should now be using rubber shielding and insulated crocodile clamps when doing a Ze.
How do you remove the earth cable and access the connections with this in place?
Can someone inform the procedure for this?
Cheers