Hi Chaps,
Am I right in thinking that that's an old voltage-sensing ELCB?
What's the status of these devices re the current regs? (I suspect that they're not regarded as offering any protection.)
 
Sorry, you're going to have to spell it out for me in simple terms guys, you're talking to the uninitiated here. :oops: Whats the issue with the installation?


Make a search for "voltage operated elcb" on this forum and elswhere, have a read up on the type of trip switch present in your installation

Here is a link to start you off

IET Forums - voltage operated e.l.c.b

They are not regarded as a suitable means of protection in the regulations
For reasons that are known to electricians,they may not operate when a fault occurs

They have not been installed for about 30 years or more
They are considered as obsolete and have been for eons

It is recomended that they should be replaced woth an Rcd
They cant be tested with everyday test instruments used by electricians,so their operation (dodgy though it may be)could not be determined

My advise
Have a new consumer unit,positioned so that the existing supply board can be fixed near to the cieling and the consumer unit alongside,then make a neat cupboard and box it in
 
Sorry, you're going to have to spell it out for me in simple terms guys, you're talking to the uninitiated here. :oops: Whats the issue with the installation?

As said already said, by Des, easiest way to tidy it up is to get it neatly boxed in and at least some rcd protection (instead of the old voltage unit) as you will be lucky to get it moved for free. I would also consider having a PIR (periodic inspection report) done as these should really be done at least every 10 years but i'm guessing this installation hasn't been looked at in 20 years. Although this could cost you around ÂŁ100, if you can find a decent local spark they may well then give you some discount of subsequent work like replacing your fuse box/consumer unit as the tests needed for that are largely duplicated in the PIR. I know you might think why should i pay so much to get it tested when everything has worked so far - but the consequences of things going wrong can be serious. If you think getting your car serviced/MOTed is sensible i would apply the same logic to your electrics :)
 
This looks very much like a TT supply, and will therefore ''NEED'' an RCD to this installation for earth fault protection. As already suggested, ...also ask your DNO if the available overhead supply has been PME'd (TNC-S). If it has, then request that your supply head is modified to provide you with that earthing system as it will afford far greater protection than the present TT system, which in all probability, will be an earth rod in the garden, or worse still under the front pavement ....

By the way, those push button Wylex MCBs (breakers) in your CU were never considered as a very good design, and the fault levels were as i remember, also on the very low side.
So i'd be seriously considering a CU change too....
 
Thanks very much everybody for their contribution,
thanksadd01-thank-you-thanks-thanks-for-the-add-smiley-emoticon-000298-medium.gif
its very much appreciated. I never thought this am when I posted that it would go to three pages. I thought I'd be told to b*gger off and stop bothering folks.
crushed-crushed-heavy-balcksmith-smiley-emoticon-000581-medium.gif


I'm up to speed now and totally agree. If plan A. dosen't come off we'll go with plan B.
Now I know why you like to play with electrics, you're such bright sparks.
zany-zany-comic-joker-smiley-emoticon-000598-medium.gif
 
Hi everybody Hope everybody survived xmas intact and New year was something you remember and you've got the special valentines surprises organised!!
I've come back to update you all on this thread [after all your sleepless nights worrying about me!!]
male23-male-tired-weary-smiley-emoticon-000065-medium.gif


I've been very slowly chipping away at this over the months since starting this and finally we've got an agreement!!!
When we first raised the issue EME sent out an electrician to assess, who said that whilst it wasn't very pretty and he wouldn't want it in his house he didn't think it was dangerous. But he said he would put forward a recommendation that the work be done. A couple of months went by, we heard nothing more.

I came in one afternoon to find a rather cross electrician waiting for me, suggesting if as I'd rung for someone to come out, it would be helpful if I stayed in. After being slightly amazed and explaining I'd not pursued the matter since Aug he had a look at the installation but really didn't seem able to offer an opinion of his own or really have a clue. He suggested it would be viewed as a new installation and it would cost us about ÂŁ1200!! He didn't even think that having a mains cable in the house was a problem as he had one in his garage [not much difference] and that provided it was properly insulated there wasn't a problem.

At which point I asked to see his chest to see if he had a large S emblazed there as obviously he had X ray vision and could see from ground level that the cable was in good condition!!!
Superman-Superman-man-of-steel-super-hero-smiley-emoticon-000997-medium.gif


So that was the end of him, xmas, new year came and went and another electrician came around and he thought we'd just rung up [getting a familiar story by now] again we went through the whole process but this time o/h suggested that we would be happy to get an electrician in to do the internal tails and we would lay the cable if they would just come and do the connecting.

Then today a lady from EME came and assessed the job and make the necessary arrangements [it only took about 4 weeks this time] She asked to have a look at the meter and was utterly horrified that a mains cable was coming straight into the house and the fresh air holding the meter on the wall.

She was apologetic that it had taken since August to get this off the ground but they had just been through a major reorganisation of company structure and people were now spread all over.

For the first time in four months somebody said yes we can see the dangers lets get something done. We are going to obtain and fit conduit and they will lay the cable and move/fit new meter since we are due to have a new one fitted anyway as thats past it best by knackered date,. Not saying its old but she went into raptures over it like she just discovered an unknown rembrant!!
tounge-roll-impress-strike-move-smiley-emoticon-000758-medium.gif

I wonder if I could put it on ebay!!!

So we're just waiting for her to seek some advice about organising the meter and then set a date [hopefully when the ground isn't like concrete].

Once the new meter is installed outside in the box, she will arrange for a team to come and remove all the old cable from the front of our poperty and next doors front wall as its a semi and the mains cable has come up from next door then run across our front house wall and right under our bedroom window, we can even touch it!!

So fingers crossed and six months from now I can come and report it all complete.
fingerscrossed-fingers-crossed-goodluck-smiley-emoticon-000674-medium.gif
 
Last edited by a moderator:

Reply to Advice needed on home electricity supply in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Hi everyone, If you are looking for reliable EV chargers, check out our top-rated selection at E2GO! ⚡ Please note that all EV Chargers and...
Replies
0
Views
161
  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
997
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
1K

Similar threads

  • Question
The last couple of de-loops that I have been involved with had the single phase supply replaced with a three phase cutout (as I believe the DNOs...
Replies
5
Views
1K
They key point: (providing great distances arent involved) meters and supply can be moved outside for people on The Priority Services Register...
Replies
11
Views
918

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top