Age of those who can build a control panel and control a process | Page 7 | on ElectriciansForums

Discuss Age of those who can build a control panel and control a process in the Commercial Electrical Advice area at ElectriciansForums.net

Do you build control systems? If so, how old are you?


  • Total voters
    42
Right ok, he's concerned for the future. Thought it was about what college teaches these days. Yes I can build control panels, design, build draft up circuit diagrams. Its almost a hobby, I enjoy it that much.
 
Looking at the thread title again “Age of those who can build a control panel and control a process” the control a process part seems to have got a bit lost.

A DOL or a Y∆ starter could be regarded as “a panel”. But how about the process control side of panel building? Things start to get complicated then.

How many would undertake a “true” control system. I’m thinking along the lines of controlling product flow or mixing where many factors come in to play.
 
Looking at the thread title again “Age of those who can build a control panel and control a process” the control a process part seems to have got a bit lost.

A DOL or a Y∆ starter could be regarded as “a panel”. But how about the process control side of panel building? Things start to get complicated then.

How many would undertake a “true” control system. I’m thinking along the lines of controlling product flow or mixing where many factors come in to play.
The panels I have built have been for controlling reactors in hazardous locations incorporating 4-20mA process control equipment, so I think that qualifies me as a 'true' panel builder.
 
The panels I have built have been for controlling reactors in hazardous locations incorporating 4-20mA process control equipment, so I think that qualifies me as a 'true' panel builder.

Lets rephrase a little what Tony says ...

A control panel builder who competent IMHO would need skills in several areas, now as control systems cover so much it would be impossible to be an all rounder for everything out there but someone with good grasp should be able to self teach new tech off the cuff and adapt to new technology. Also they would in my opinion be able to :-

-Build a panel within the scope of the Low Voltage Directive and the associated British Standards (Usually BS 60204).
-Be able to risk assess and understand the safety cat' the control system would require to be built to to meet the machinery directive regarding the health and safety requirements, also to have a grasp of the use of work equipment directive.
-Compliance with EC directives regarding EMC, harmonics and RF interference.
-I would expect any panel builder to have some understanding and working knowledge of old and modern technology in order to give good value for money while offering the best solution available, this would mean a base understanding of safety systems, plc's, vsd's, digital and analogue equipment, although not all essential if a specialised panel builder where some areas will not be necessary.

20yrs ago I could build panels with 0-10v, 4-20mA etc process control but knowing what I know now and looking back I realise I knew nothing and my first panels were poor in design and complied with little if any regulation, but thats what in house allowed you to do because it wasn't going to market.... I come across many panels some brand new that fall well short of the LV directive and in some cases are a danger to the end user ...yes the do the job intended but not fail safe so when we ask who's a panel builder you really should list out as I have what you expect a panel builder to be able to do....

People can spend their lives building panels to spec', following wiring plans and loading pre-programmed software without any idea what the in and outs of the system is and are more of a production line worker but still with the tag panel builder but its those who can design, build, adapt, extend and/or alter existing and fault find both new and old set ups that would get my respect as a fully fledged control equipment designer and builder.
 
Last edited by a moderator:
Did you perform the Hazop and FDS for these reactors?
No management did that, I did the initial MOC's but I suppose if you dig deep enough you'll find some directive I didn't comply with, which you can then use to prove that you are superior to me.
 
No management did that, I did the initial MOC's but I suppose if you dig deep enough you'll find some directive I didn't comply with, which you can then use to prove that you are superior to me.

Bit touchy aren't you?

I was only curious having finished a project involving 3 Atex rated chemical reactors only a few months ago.
 
Im 21, working in the utilities industry, doing maintenance I currently make small control panels for small processes, I can program low level PLCs like your Zelios (Primarily schneider gear) and to high level structured text on M340, with a little help on the more complex control. Safety systems am I ok at to a basic level I usually have to ask for a bit of guidance on how more complicated panels/systems should be setup which the more mature guys help with. Ive got miles more to learn in my field of instruments and automation. But love all of it.

You are rally young.

I'm 27 but I'm more into electronics in general. Worked as a PMR radio service technician and RF engineering trainee/assistant. We used VFD's for antenna rotators and PLC's for 30 MHz antenna commutation.
 

Reply to Age of those who can build a control panel and control a process in the Commercial Electrical Advice area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
717
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
3K

Similar threads

Thought I'd update this. Finally had my assessment today. I chased them on Friday morning as it'd been about 10-12 weeks since I'd actually made a...
Replies
5
Views
2K
  • Question
Hi Gingerrubix, The fact that your previous Tenant replaced a faulty socket plate which he used for an external EV, raises an eyebrow. Also your...
2
Replies
25
Views
3K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top