alternatives? | Page 4 | on ElectriciansForums

Discuss alternatives? in the UK Electrical Forum area at ElectriciansForums.net

S

shadewakka

Just fitted a 17th edition CU in a clients house.

the old cu was a metal clad old style, the house electrics have had extensive DIY work by the previous owner, had nothing but problems fitting this, RCD kept tripping, circuits not working etc, pain in the arse, various circuits with incorrect size cables, and about 4-5 wires in one 32 breaker as the previous owner has ran 'spurs' for there.

could not pick up a continuity reading as the tester kept going to 2000.
could only get reading from certain circuits at approx 1.58

In my opinion seeing the installation state id say its a disaster waiting to happen, and a rewire would be most appropriate.

Client would rather not rewire and i cannot think of any alternative, solutions??
 
why oh why... i asked myself the same question.

the job was under a tight deadline to complete and continuity was carried out before hand,
but everything was already been taken a part, so carried on with the job.

I know the old school will not be so forgiving! haha

What about Insulation Resistance testing mate, a real basic balls up on your part no sympathy whatsoever , oh by the way 2000 and 1.58 what, potatoes?
 
Pre testing and covering your ar$e with pricing obviously isn't something you're taught in the 5day 'become an electrician, part p, buy a qualification' course then???
If you don't have the experience or common sense to 'suss' out an installation when you first arrive on site, I question whether you should be carrying out the job at all.
As it has been said before, you've dropped a ------- , made an --- of yourself, left yourself wide open and the install unsafe.
There is no alternative, you'll have to put it right.
If you had any common sense or experience you'd know, whether a 'rewire' is required or not, wouldn't be in question... It'll either be something you can put right with alterations and improvements, or it'll need a complete rewire. If you can't decide on that, after carrying out CU change and being onsite for 6hrs, you really are in the wrong job...
 
why oh why... i asked myself the same question.

the job was under a tight deadline to complete and continuity was carried out before hand,
but everything was already been taken a part, so carried on with the job.

I know the old school will not be so forgiving! haha

You need an Insulation Resistance Test at 1,000 Volts for a full five minutes between your right ear and you left --------.

It will help you to remember the importance of testing before you start buggering about and making a complete pratt of your self.
 
The thought of a quick $ dictated the board must be changed.

It’s great when a plan comes together, even better watching someone else’s plan fall apart.
Hell yes, this is one of these threads which needs sticking in the numpty forum letting the enthusiasts know the dire consequences of not doing the Job properly
 

Reply to alternatives? in the UK Electrical Forum area at ElectriciansForums.net

Similar threads

  • Question
Sometime in the 90's some 7-11 convenience stores in the area (I'm USA based) got 2 strange looking "speakers" installed on either side of their...
2 3
Replies
42
Views
2K
  • Question
If they got a shock then something cannot have been isolated.
Replies
7
Views
1K

Recommended Sponsor News

Exclusive Forum Offer! Free euro 2024 wall chart for first 10 responses!

Hi everyone,

We have 10 exclusive Uheat EURO 2024 Wallcharts to giveaway for Electricians Forum Members! The first 10 people to reply YES to this thread - I will message and get them sent out to you just in time for this years tournament! GO GO GO

Quickwire Now Sponsor ElectriciansForums.net

I am sure you will join me in welcoming our newest sponsors of ElectriciansForums.net - Quickwire! They have decided to join us after seeing you guys discussing their products here. Now we have an expert on board that you can chat to @Quickwire-Sam who will be happy to answer your queries!

[ElectriciansForums.net] Quickwire Now Sponsor ElectriciansForums.net


@Quickwire-Sam said "At Quickwire, we're all about speed, safety, and reliability. We're a family-run business, and every Quickwire connector is proudly made right here in the UK, ensuring noticeable quality. In short, Quickwire is the fastest connection method on the market. Whether you're an experienced electrician or a DIY enthusiast, Quickwire makes electrical connections ridiculously quick and easy. We're passionate about blending British craftsmanship with innovation. If you have any questions or if there's any way we can help, please just ask me!"

PCBWay Now Sponsor ElectriciansForums.net!!

I hope you will all join me in welcoming our newest sponsor to the forum PCBWay! You can contact their friendly people by sending a message to @PCBWay who will be happy to answer your queries.

Welcome to the community and thanks for your sponsorship!

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

PCBWay provides services including PCB Prototype and batch Production, PCB Assembly (SMT), 3D Printing, CNC Machining, PCB Design, Electronics Modules Selling, etc. We are committed to meeting the needs of global makers from different industries in terms of quality, delivery, cost-effectiveness, and any other demanding requests in electronics.

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top