At an installation today with three core 3 phase cable comimg in and the armour went into a connector providing the neutral (old photos were available from when work was done so could see this in DNOs box). 3 phases and neutral passed into the main DB but no MET. From the main DB the earth strip has two 35mm (approx) insulated earth cables going into concrete floor I cant find the other ends.
This is a caravan site and the three sub mains fed by SWA do have earth spikes as they have to be TT. Would you think the two 35mm earth cables in the main DB will go off to other earth spikes somewhere or what ?