called to a job to day where a customer says their emersion heater not working ,gets to the job ,open the cupboard and a nice unvented cylinder .
now this unvented cylinder has not one but two elements feed from a 2.5 cable the old emersion switch ,but wait on why is there two 3kw on..
now 3X2=6kw , the fuse had blown now ,this system wet pants have put in is a pressurised system ,their is no gas but water feed . now a nice new 6mm feed for both elements .and top it all the gas &water needs bonding has well.
now this unvented cylinder has not one but two elements feed from a 2.5 cable the old emersion switch ,but wait on why is there two 3kw on..
now 3X2=6kw , the fuse had blown now ,this system wet pants have put in is a pressurised system ,their is no gas but water feed . now a nice new 6mm feed for both elements .and top it all the gas &water needs bonding has well.
Last edited: